GaryNap111
Member
- First Name
- Gary
- Joined
- Feb 19, 2018
- Threads
- 3
- Messages
- 20
- Reaction score
- 5
- Location
- Central Jersey
- Vehicle(s)
- 2018 Jeep JL Rubicon 6spd
· Order is in the scheduling phase of the manufacturing process.
· The parts required to build the vehicle are being scheduled and as soon as they available and ready, order will be scheduled for build.
· Most orders are scheduled for build within 30 days after reaching this stage.
There is no build date or shipping information showing at this time. The information that I received from my mentor is that the production of the 2 door Wranglers will begin in April.
Sponsored
