Goin2drt
Well-Known Member
I went and got the 2x4’s to center it. So I span the joists that are running front to back but the 2x4‘s go left to right to span them. Then I attach the racor brackets running front to back at each corner into the 2x4 correct? so the racor will be held in place by 4 lag bolts total?