spurly
Well-Known Member
- Thread starter
- #31
Just an update for everyone, the shop fell behind on production a little. Between steel allocations and short handed, they're back logged. I have everything else at the house (rivnuts, bus bars, wire, etc) ready to go. So once I get the brackets I'm hoping I should be able to knock them out within a week or two. Thanks for being patient.
Sponsored