CODE | DESC | ARRIVAL | UPDATED |
---|---|---|---|
CURRENT STATUS | |||
C | Order Confirmed | 2022-12-16 | |
D1 | Scheduled | 2022-12-20 | |
E | In Production | 2023-03-15 | 2023-01-26 |
KZ | Vehicle Built | TBD | 2023-01-28 |
KZM | Shipped | TBD | 2023-01-30 |
KZX | Delivered |
CODE | DESC | ARRIVAL | UPDATED |
---|---|---|---|
PREVIOUS STATUS | |||
C | Order Confirmed | 2022-12-16 | |
D1 | Scheduled | 2022-12-20 | |
E | In Production | 2023-03-15 | 2023-01-26 |
KZ | Vehicle Built | 2023-02-19 | 2023-01-28 |
KZM | Shipped | 2023-02-19 | 2023-01-30 |
KZX | Delivered |
It was probably deliveredThis morning I got an update saying the Jeep would be delivered tomorrow (Sun 2/19) Tonight I get an up date showing it to be TBD. See attached screen shot. Anyone else run into this?
CURRENT STATUS CODE DESC ARRIVAL UPDATED C Order Confirmed 2022-12-16 D1 Scheduled 2022-12-20 E In Production 2023-03-15 2023-01-26 KZ Vehicle Built TBD 2023-01-28 KZM Shipped TBD 2023-01-30 KZX Delivered
PREVIOUS STATUS CODE DESC ARRIVAL UPDATED C Order Confirmed 2022-12-16 D1 Scheduled 2022-12-20 E In Production 2023-03-15 2023-01-26 KZ Vehicle Built 2023-02-19 2023-01-28 KZM Shipped 2023-02-19 2023-01-30 KZX Delivered
I'm picturing the dealer giving a circle of nervous new Wranglers an inspirational pep talk about meeting their new owners.Call the dealer when they open but they usually need a day or two to prepare it.
Not sure, but I’m in a similar boat where I’ve been in production for almost a month too… I’m kind of expecting the same situation on my side. No idea why a build would take a month while others take a dayThis morning I got an update saying the Jeep would be delivered tomorrow (Sun 2/19) Tonight I get an up date showing it to be TBD. See attached screen shot. Anyone else run into this?
CODE DESC ARRIVAL UPDATED CURRENT STATUS C Order Confirmed 2022-12-16 D1 Scheduled 2022-12-20 E In Production 2023-03-15 2023-01-26 KZ Vehicle Built TBD 2023-01-28 KZM Shipped TBD 2023-01-30 KZX Delivered
CODE DESC ARRIVAL UPDATED PREVIOUS STATUS C Order Confirmed 2022-12-16 D1 Scheduled 2022-12-20 E In Production 2023-03-15 2023-01-26 KZ Vehicle Built 2023-02-19 2023-01-28 KZM Shipped 2023-02-19 2023-01-30 KZX Delivered
I reached to to Jeep chat on the 9th and they escalated because it had been in production for 24 days. Received an email on the 10th from Jeep and was told someone would be monitoring with a special tracking file. Have heard nothing since then.That could be. I reached out to Jeep chat and it’s still in production status. They are escalating to see what’s going on.
I picked my Jeep up a week ago, but Jeep.com tracker still says delivery "TBD" and I never got an email from Jeep to let me know Jeep had arrived!I reached to to Jeep chat on the 9th and they escalated because it had been in production for 24 days. Received an email on the 10th from Jeep and was told someone would be monitoring with a special tracking file. Have heard nothing since then.
Received a tracker update email on 2/17 that vehicle had been built. Randomly checked my dealers webpage 2/18 and it was sitting on the lot (in KY)! Don’t count on the tracker, it’s not accurate even when escalated.
I got 4m4 as well Is it a major issue or just a longer possible wait?Got the dreaded 4M4 code today, three days before Build Date. I'll contact the dealer tomorrow to see about new dates.
Somebody else posted about the 4M4 code a few pages back and theirs was delayed about a week I think.I got 4m4 as well Is it a major issue or just a longer possible wait?
Ok so not like I have to worry about it being cancelled or something i just joined the tracker with codes a day or so ago so this is my first email with a code notificationSomebody else posted about the 4M4 code a few pages back and theirs was delayed about a week I think.
It has been seeming that your Build date shifts a little. Hopefully, just a little.Ok so not like I have to worry about it being cancelled or something i just joined the tracker with codes a day or so ago so this is my first email with a code notification
Have a pretty similar build (everything the same except no Safety but LED, dark saddle, black hard top) and mine moved also got a 4M4 but only yesterday. Sad, but it's not too bad since I only ordered 3 weeks ago.Got the dreaded 4M4 code today, three days before Build Date. I'll contact the dealer tomorrow to see about new dates.