2023 Orders - Check in here

Jtaugner

Well-Known Member
Joined
Jun 17, 2022
Threads
7
Messages
269
Reaction score
380
Location
Upstate SC
Vehicle(s)
23 JLURD / 03 Cobra
Build Thread
Link
Just got my information from Mike @ MoG.. I've got a build date of 8/15, said approximately first week of September for delivery, assuming the 15th holds true.
Sponsored

 

mtbgordon

Well-Known Member
First Name
Kyle
Joined
May 23, 2022
Threads
2
Messages
53
Reaction score
119
Location
PA
Vehicle(s)
2023 JLURXR 2022 GCL
Jeep Wrangler JL 2023 Orders - Check in here Rub.JPG

Ordered 6/15, already scheduled for assembly as of 7/6 per VOT. Cold weather, LED, XR, tow, and leather. Ordered all the small interior accessories, hopefully wont hold up delivery too much.
 

rkeen81

Well-Known Member
Joined
Jan 27, 2021
Threads
9
Messages
214
Reaction score
224
Location
Florida
Vehicle(s)
2019 JLU Rubicon/2023 JLU Rubicon 4xe (Hydro Blue
Just got my information from Mike @ MoG.. I've got a build date of 8/15, said approximately first week of September for delivery, assuming the 15th holds true.
Mike is great!
 

dmk08

Well-Known Member
Joined
Jul 28, 2021
Threads
0
Messages
60
Reaction score
69
Location
Atlanta
Vehicle(s)
None
Just got my information from Mike @ MoG.. I've got a build date of 8/15, said approximately first week of September for delivery, assuming the 15th holds true.
Mike told me even tho I ordered before most of the scheduled people and dont have any outlier options I for whatever reason am not scheduled. Worried Im going to end up one of these orders that lingers for no reason.
 

Jtaugner

Well-Known Member
Joined
Jun 17, 2022
Threads
7
Messages
269
Reaction score
380
Location
Upstate SC
Vehicle(s)
23 JLURD / 03 Cobra
Build Thread
Link
Mike told me even tho I ordered before most of the scheduled people and dont have any outlier options I for whatever reason am not scheduled. Worried Im going to end up one of these orders that lingers for no reason.
I really think with today's climate in logistics, options play a big part of what gets built first. Mopar Accessories and (Advanced)Safety Options would strike me as the biggest culprits.

Mines pretty barebones, Tow Package, Cold Weather and Hard Top. I did go EcoDiesel but I would assume they keep a minor stock since the engines have to come from Italy and transmissions are coming from Germany.
 

Sponsored

dmk08

Well-Known Member
Joined
Jul 28, 2021
Threads
0
Messages
60
Reaction score
69
Location
Atlanta
Vehicle(s)
None
I really think with today's climate in logistics, options play a big part of what gets built first. Mopar Accessories and (Advanced)Safety Options would strike me as the biggest culprits.

Mines pretty barebones, Tow Package, Cold Weather and Hard Top. I did go EcoDiesel but I would assume they keep a minor stock since the engines have to come from Italy and transmissions are coming from Germany.
So my good friend ordered the exact same build as me 2 weeks later. Both from Mike. He got scheduled yesterday and I didn't. Only difference is his is Sarge Green w/ Brown interior and mine is Sting w/ Black.

Yesterday I thought he didnt get the two accessories (floor mats and gate re-enforcement) that I did but turns out he did.
 

Storm Cloud

Well-Known Member
Joined
Mar 3, 2022
Threads
11
Messages
345
Reaction score
604
Location
Huntington Beach, CA
Vehicle(s)
2023 JLUR 4xe
Build Thread
Link
I really think with today's climate in logistics, options play a big part of what gets built first. Mopar Accessories and (Advanced)Safety Options would strike me as the biggest culprits.

Mines pretty barebones, Tow Package, Cold Weather and Hard Top. I did go EcoDiesel but I would assume they keep a minor stock since the engines have to come from Italy and transmissions are coming from Germany.
I would think it’s more the Mopar accessories than anything. My old dealer had told me about safety group and tow octave causing delays and I’m sure it did. But I ordered every single package available this time around and none of the Mopar accessories, except the mirrors and I somehow got scheduled very quickly. As I write this, I’m starting to wonder if there is really any rhyme or reason at all.
 

Ratbert

Well-Known Member
First Name
John
Joined
Jun 20, 2020
Threads
159
Messages
16,162
Reaction score
25,231
Location
PNW
Vehicle(s)
2022 AEV JL370 JLURD
Build Thread
Link
Occupation
Software Engineer
Clubs
 
From what I've seen around, Once you are scheduled, it's typically 4 to 5 weeks before production. I have a scheduled build date of 8/25. I was put on the schedule 7/6. So 7 weeks. I heard production of the 2022's (what's left that wasn't converted to 2023's) should wrap up before the week shutdown at the end of this month.

My dealer said that he has a guy that did an order in January and hasn't gotten scheduled yet. Yet, here I am, new(ish) order in June and am already on schedule. You have to think that maybe they do them in paint color batches?
If you watch the videos of the production line you'll see various colors mixed together.
 

Shasha1334

Well-Known Member
First Name
Shane
Joined
Jun 14, 2022
Threads
1
Messages
117
Reaction score
112
Location
Florida
Vehicle(s)
2016 JKUR Hard Rock edition
Any Sport/Sport S/Willys get scheduled yet? Seems like all Rubicons so far
 

dmk08

Well-Known Member
Joined
Jul 28, 2021
Threads
0
Messages
60
Reaction score
69
Location
Atlanta
Vehicle(s)
None
If you watch the videos of the production line you'll see various colors mixed together.
Yeah my color theory went out the window quickly as many in here have ordered Sting. If Im not scheduled in the next 2 weeks Im going to ask Mike to cancel my order and re-do one. I honestly think for whatever reason some people just get stuck.
 

Sponsored

Morrepe

Well-Known Member
First Name
Peter
Joined
Jul 3, 2022
Threads
10
Messages
553
Reaction score
797
Location
DC
Vehicle(s)
2023 2 dr Sarge Green Willys, Soft Top 3.6L MT
Any Sport/Sport S/Willys get scheduled yet? Seems like all Rubicons so far
I'm a Wyllis 2Dr and not scheduled. But, I only ordered 7/4.
 

Jtaugner

Well-Known Member
Joined
Jun 17, 2022
Threads
7
Messages
269
Reaction score
380
Location
Upstate SC
Vehicle(s)
23 JLURD / 03 Cobra
Build Thread
Link
I would think it’s more the Mopar accessories than anything. My old dealer had told me about safety group and tow octave causing delays and I’m sure it did. But I ordered every single package available this time around and none of the Mopar accessories, except the mirrors and I somehow got scheduled very quickly. As I write this, I’m starting to wonder if there is really any rhyme or reason at all.
Just using @rkeen81 as an example, he placed his order 6/15, Scheduled 7/6 and Est. Build Date of 8/25. He has a lot more options than I do.

I placed my order 6/29, Scheduled 7/6 and Est Build Date of 8/15.

Now some of it could be he's getting a 4xe, but I would guess some of it has to be options.
 

Santana74

Well-Known Member
First Name
Jamie
Joined
Jun 21, 2022
Threads
0
Messages
174
Reaction score
303
Location
Alabama
Vehicle(s)
23 Wrangler Sahara Altitude 3.0l, 18 Jaguar F-Pace
Anyone else Sting Grey? Maybe it's color batches.
Sahara Altitude Diesel in Stingrey here. It appears all the scheduled orders posted are Rubicons.
 
 