don4v4n
Well-Known Member
- Joined
- Nov 10, 2018
- Threads
- 2
- Messages
- 46
- Reaction score
- 28
- Location
- Portland, Oregon
- Vehicle(s)
- 2019 JL Wrangler Unlimited Rubicon on order
- Thread starter
- #1
Sumitted a new order November 12th and received my VIN on the 16th. I'm tracking my build on multiple sites. Obviously in "D" status.
My question is what is the average build timeline? My dealer told me it's typically 6-8 weeks, but mine would more than likely be 8-12 weeks due to my spec (Due to Manual, LEDs and Steel Bumpers?):
I have ordered several other vehicles from different manufactures in the past and I realize there are several factors involved, such as:
Also, with the changeover to 2019 Model Year, does that create a pent demand of builds as they have been excepting 2019 orders for a few weeks/months but just started the 2019 model year production?
I'm located in Oregon and I'm curious what you guys think my ETA would be based on what has happened up to now with JL builds... I realize it's all guess work at this point and I am fine with the wait as this is nothing. My previous vehicle orders have taken several months, one being 14 months (Custom Paint on a limited run).
Needless to say, I'm excited to be back into a Rubicon again!!!
My question is what is the average build timeline? My dealer told me it's typically 6-8 weeks, but mine would more than likely be 8-12 weeks due to my spec (Due to Manual, LEDs and Steel Bumpers?):
-WRANGLER UNLIMITED RUBICON
-3.6L V6 24V VVT Engine Upg I w/ESS
-6-Speed Manual Transmission
-Billet Silver Metallic
-Black Leather Trimmed Bucket Seats
-Black 3-Piece Hard Top
-Remote Proximity Keyless Entry
-MOPAR All-Weather Floor Mats
-Steel Bumper Group
-Safety Group
-Electronic Infotainment System Group
-LED Lighting Group
-Trailer Tow and HD Electrical Group
-Cold Weather Group
-Body Color Fender Flares
-3.6L V6 24V VVT Engine Upg I w/ESS
-6-Speed Manual Transmission
-Billet Silver Metallic
-Black Leather Trimmed Bucket Seats
-Black 3-Piece Hard Top
-Remote Proximity Keyless Entry
-MOPAR All-Weather Floor Mats
-Steel Bumper Group
-Safety Group
-Electronic Infotainment System Group
-LED Lighting Group
-Trailer Tow and HD Electrical Group
-Cold Weather Group
-Body Color Fender Flares
I have ordered several other vehicles from different manufactures in the past and I realize there are several factors involved, such as:
-Dealer Allocations
-Dealer Status?
-Possible Batch Builds (some do this, not sure if Jeep does?)
-Supply Of Parts based one's spec
-The orders before me
-Holidays
-Weather
-Delivery Schedules (Truck/Rail)
-Dealer Status?
-Possible Batch Builds (some do this, not sure if Jeep does?)
-Supply Of Parts based one's spec
-The orders before me
-Holidays
-Weather
-Delivery Schedules (Truck/Rail)
Also, with the changeover to 2019 Model Year, does that create a pent demand of builds as they have been excepting 2019 orders for a few weeks/months but just started the 2019 model year production?
I'm located in Oregon and I'm curious what you guys think my ETA would be based on what has happened up to now with JL builds... I realize it's all guess work at this point and I am fine with the wait as this is nothing. My previous vehicle orders have taken several months, one being 14 months (Custom Paint on a limited run).
Needless to say, I'm excited to be back into a Rubicon again!!!
Sponsored
Last edited: