Wideglide10
Well-Known Member
- First Name
- Scott
- Joined
- Dec 4, 2020
- Threads
- 2
- Messages
- 95
- Reaction score
- 134
- Location
- Gilbert, IA
- Vehicle(s)
- 2024 Rubicon X, 1979 Silver Anniversary CJ5
I will see where I am I have a contact I can use.
Sponsored
Mine is still D1 supposed to start framing at end of the month.
What is your estimated build date?Awesome, keep us posted
Just finished up with Jeep chat. No estimated build date yet but strangely enough, I was told that my status has changed from "awaiting 392 scheduling period to begin" to now being "in scheduling period". Can't help but wonder how a few others (very few) had build dates weeks ago?In the same boat as @ALLEYCAT740 , VIN has been assigned since 12/10 and in D status. Come onD1...
so i went by my dealership today, BX - good order availabel for scheduling. I got my VON # 11-20-20 the day after the order banks opened. The last time I went by the dealership 12-16- 20 I was BG - Order has passed edit but cannot be considered for scheduling, and still showing =Restriction.
The = Ristriction is no longer showing. I read earlier the VON # was how Jeep scheduled your build date? The lower the VON # the earlier the build and VIN# assignment? I know some orders were restricted due to half door color problems which I did not order. I did order the sky one touch power top, was that what was slowing it down? My color is Black Clear Coat, i heard that some colors have slowed build dates scheduling problems but Black shouldnt be a problem? This will be my 5 vehicle order through FCA. The turn around on my 2 previous Jeeps was exactly 6 weeks from the time i placed the order until the time i had the keys in my hand. I know this was going to take longer but was anticipating to end of February delivery but i guess thatās just a pipe dream.
FWIW, I have the power top, the camera, & tow package - in Sting-Gray - no half doors. I ordered on 23NOV and it was BX by 03DEC. Checked with Jeep Chat today & still no VIN. From a purely numerical standpoint, my VON (first 4: 4749) is higher than your VON (first 4: 4748).
I too received my VON # (4748) on 11-20. Granite Crystal, Sky One-Touch, Half Doors and mostly every other option offered. Received VIN on December 10th, so I canāt understand why other than color, they could be holding up your VIN. I did not hear that black was one of the problem colors. I feel for you being that we ordered on the same day and would suggest contacting Jeep Care via chat every day for a status update until they create a case # for you. Hopefully you will get some good news soon.so i went by my dealership today, BX - good order availabel for scheduling. I got my VON # 11-20-20 the day after the order banks opened. The last time I went by the dealership 12-16- 20 I was BG - Order has passed edit but cannot be considered for scheduling, and still showing =Restriction.
The = Ristriction is no longer showing. I read earlier the VON # was how Jeep scheduled your build date? The lower the VON # the earlier the build and VIN# assignment? I know some orders were restricted due to half door color problems which I did not order. I did order the sky one touch power top, was that what was slowing it down? My color is Black Clear Coat, i heard that some colors have slowed build dates scheduling problems but Black shouldnt be a problem? This will be my 5 vehicle order through FCA. The turn around on my 2 previous Jeeps was exactly 6 weeks from the time i placed the order until the time i had the keys in my hand. I know this was going to take longer but was anticipating to end of February delivery but i guess thatās just a pipe dream.
Hmmm. I just noticed you have some āspecial equipmentā listed on the bottom your order that I donāt have on mine. 99762A - That could very well be the reason for the delay. What special equipment is that if you donāt mind me asking?so i went by my dealership today, BX - good order availabel for scheduling. I got my VON # 11-20-20 the day after the order banks opened. The last time I went by the dealership 12-16- 20 I was BG - Order has passed edit but cannot be considered for scheduling, and still showing =Restriction.
The = Ristriction is no longer showing. I read earlier the VON # was how Jeep scheduled your build date? The lower the VON # the earlier the build and VIN# assignment? I know some orders were restricted due to half door color problems which I did not order. I did order the sky one touch power top, was that what was slowing it down? My color is Black Clear Coat, i heard that some colors have slowed build dates scheduling problems but Black shouldnt be a problem? This will be my 5 vehicle order through FCA. The turn around on my 2 previous Jeeps was exactly 6 weeks from the time i placed the order until the time i had the keys in my hand. I know this was going to take longer but was anticipating to end of February delivery but i guess thatās just a pipe dream.
Beat the heck out of me, I didnāt order any xtra special equipment! Does anyone know what special equipment is? Sales code #99762A what is this?Hmmm. I just noticed you have some āspecial equipmentā listed on the bottom your order that I donāt have on mine. 99762A - That could very well be the reason for the delay. What special equipment is that if you donāt mind me asking?