Yngwie
Well-Known Member
- Thread starter
- #1
From what I can tell, I was the first member of the forum to place an order for a 2020 Sarge Green JL. This was on January 24, 2020 for a Rubicon, 3.6L, auto trans, soft top, with both safety groups, cold weather group, premium audio, black leather seats, and the trailer tow group.
Other members are indicating their Sarge Green JL's are built and there are Sarge Green JL's showing up at the dealers. However, my order is still only in D1 status.
What is more frustrating is that it entered D status on 1/29, then D1 status on 2/3 with an estimated ship date of 2/12, then BACK TO D STATUS on 2/11 still with an estimated ship date of 2/12, then back to D1 status on 2/17, but now with an estimated ship date of 3/4.
Maybe I missed something, but I have not heard of anyone going from D to D1 and then back to D status.
Originally, the dealer recommended I wait to join Tread Lightly until ordering. Tread Lightly requires a 30 day wait period to get the 1% discount and the original ship date would have been too early. I mentioned that to the dealer and then the status and ship date changed. Probably coincidence, but still frustrating to keep having everything pushed back while other members indicate their Sarge Green JL's are already built.
Also, that's the challenge of giving customers information, such as estimated ship dates, that can change. It creates frustration when a client is given an estimate that is later changed to the detriment of the client, especially with the knowledge of other clients leapfrogging the estimate.
Meh... First world problems. Thanks for reading.
Other members are indicating their Sarge Green JL's are built and there are Sarge Green JL's showing up at the dealers. However, my order is still only in D1 status.
What is more frustrating is that it entered D status on 1/29, then D1 status on 2/3 with an estimated ship date of 2/12, then BACK TO D STATUS on 2/11 still with an estimated ship date of 2/12, then back to D1 status on 2/17, but now with an estimated ship date of 3/4.
Maybe I missed something, but I have not heard of anyone going from D to D1 and then back to D status.
Originally, the dealer recommended I wait to join Tread Lightly until ordering. Tread Lightly requires a 30 day wait period to get the 1% discount and the original ship date would have been too early. I mentioned that to the dealer and then the status and ship date changed. Probably coincidence, but still frustrating to keep having everything pushed back while other members indicate their Sarge Green JL's are already built.
Also, that's the challenge of giving customers information, such as estimated ship dates, that can change. It creates frustration when a client is given an estimate that is later changed to the detriment of the client, especially with the knowledge of other clients leapfrogging the estimate.
Meh... First world problems. Thanks for reading.
Sponsored