StGrXR
Member
- Joined
- Dec 28, 2021
- Threads
- 1
- Messages
- 22
- Reaction score
- 39
- Location
- Dallas, TX
- Vehicle(s)
- 2022 JLUR XR
The trend has been that the estimated ship date which now populates your updated POC form is actually when your unit enters framing, body vendor, etc. Window sticker usually follows within the next 3 days and means it's pretty close to done (if not already) and can be tracked on sites like Cryptostickers or requested from FCA/Stellantis themselves. It still may take a while to leave accessories and final inspection. Then another wait for rail/truck.I am new to this ordering process. I am a bit confused about you stating Est Ship Date (Build start) 9/5. I thought ship date would be when it was already built and ready to ship but again, I’ve never went through this before. Congrats on your build!
Sponsored

?