Javwohl
Well-Known Member
Hmm maybe it’s the color that’s three of us with punk’n and taking awhile to get built, I thought it was because I order the 4.88 gears but could be wrong.
Sponsored
I was scheduled with the first batch of Punkn's back on 12/20, so I was thinking I would be among the first with a 23 model. Then a few made it to production before mine did on 1/30. There have been several that have been ordered after that date that have already been completed so Im not exactly sure whats holding some up. The only thing I can figure on my own is the flooring as im the only one on the tracker in scheduled.Hmm maybe it’s the color that’s three of us with punk’n and taking awhile to get built, I thought it was because I order the 4.88 gears but could be wrong.
Oh I get that I can see the vinyl floor holding it up, for me I haven’t seen any movement of the 4.88 gears in almost a month so I think that’s what’s holding me up mostly but could be a bunch of stuff or it could just be Jeep say screw you we ain’t building it for a long time. ?I was scheduled with the first batch of Punkn's back on 12/20, so I was thinking I would be among the first with a 23 model. Then a few made it to production before mine did on 1/30. There have been several that have been ordered after that date that have already been completed so Im not exactly sure whats holding some up. The only thing I can figure on my own is the flooring as im the only one on the tracker in scheduled.
![]()
I have a very similar build confirmed on 2/20. Will be following your status - hopefully we move quickly!I placed my order on February 15th and received the VON and VIN shortly thereafter. Now I'm impatiently waiting to move to Scheduled status.
![]()
Neither did I.FYI, I didn't order vinyl flooring.
Check your email. The tracker will tell you what the change is and indicate if it's minor or means anything.I got my first tracker notification of a change today ?. But . . . I don’t see any change. Is there sometimes a lag?![]()
![]()
Since we both order on the 14th and went into d1 on the 21st and I see both our changes happened with in a min of each other I would guess you got 4m4 code added which is d1 to d regress should show up at the bottom of the option part if soI got my first tracker notification of a change today ?. But . . . I don’t see any change. Is there sometimes a lag?![]()
![]()
Thanks, that was it. Although the email says it "MAY mean you regressed from D1 to D", I'm just going on the assumption that's it. I'll ping Koons tomorrow to see what they say.Check your email. The tracker will tell you what the change is and indicate if it's minor or means anything.
In my case... I'm at 6+ months. That amount of time is an outlier from what I've seen on the forums.
Our orders have tracked pretty closely…Order Confirmed 12/29/2022
Scheduled 02/10/23
Production 02/16/23
Vehicle Built 02/20/23
Shipped 02/22/23
Arrived 03/15/23 (5 Days Early than original date on jeep tracker which was the 20th for Arizona arrival )
Note: that the arrival did not update to correct arrival date until following day. Salesperson called me day off and tracker updated the next day that it had arrived.
![]()
![]()
If you look on the Jeep configuration site it shows Premium Black Sunrider Soft Top with a price of $695 is you get it from the factory. It may only be $695 as an extra part with the Hardtop. It is definately a lot more expensive if you buy it after the purchase...I may be wrong but I believe the $700 Sunrider is the convertible part for the hard top. The full soft top is way more than that.