Sponsored

2 DOOR JL build/order discussions master thread

J.R. Quimby

Well-Known Member
First Name
Jake
Joined
Dec 23, 2017
Threads
2
Messages
5,230
Reaction score
31,856
Location
Waterville Maine
Vehicle(s)
2004 TJ Sport
Still in D status here as well. I wonder if they are building auto's before the manuals? Seemed to be the case with the 4 door. I ordered a hard top manual. Also heard hardtop production started the 12 FEB and soft top will be march. Guess we will all know soon enough...or not.
As far as I know auto's are the focus and March is the start date for two doors. Just because some have gone to D1 does not mean it is running down the production line immediately.
Sponsored

 

C137

Well-Known Member
First Name
Dusty
Joined
Dec 31, 2017
Threads
0
Messages
47
Reaction score
57
Location
PCB, FL
Vehicle(s)
2006 TJ Unlimited
As far as I know auto's are the focus and March is the start date for two doors. Just because some have gone to D1 does not mean it is running down the production line immediately.
Literally anything can happen, but all the info has been 12 FEB for 2 door production. Starting with hard tops and then March for soft tops. Things change all the time though so who knows. Hitting D1 is still great. It at least shows progress to some extent.
 
OP
OP
warc1

warc1

Well-Known Member
Joined
Aug 21, 2017
Threads
11
Messages
381
Reaction score
608
Location
Winnipeg, Canada
Vehicle(s)
2018 2dr JL Rubicon, 2016 Corvette Z06
As the OP, I'm really pleased to be the first to post into this thread with a scheduled 2dr build. Projected ship date is 11 days away so it sure looks like hardtop 2drs are being built now as per the plant timeline. Told I may get it around mid March.

Jeep Wrangler JL 2 DOOR JL build/order discussions master thread Scan_20180213
 
Last edited:

Scott1911

Well-Known Member
First Name
Scott
Joined
Dec 6, 2017
Threads
1
Messages
183
Reaction score
286
Location
Oklahoma
Vehicle(s)
JL 2 Door Unicorn
Now I am starting to feel like some of the "4 door people". My 2 door auto hardtop rubi ordered on 12/6 with a ship date of 2/06 is still in D.

Random number scheduling?

Jeep Wrangler JL 2 DOOR JL build/order discussions master thread d
 
OP
OP
warc1

warc1

Well-Known Member
Joined
Aug 21, 2017
Threads
11
Messages
381
Reaction score
608
Location
Winnipeg, Canada
Vehicle(s)
2018 2dr JL Rubicon, 2016 Corvette Z06
It's worthwhile getting another update since yours is from last week. The first reported D1 status for a 2DR that I've seen happened on Saturday and mine is today.
 

Sponsored

Crazyramses

Active Member
Joined
Dec 26, 2017
Threads
1
Messages
44
Reaction score
42
Location
Havelock, NC
Vehicle(s)
2018 JLU Bright White
As the OP, I'm really pleased to be the first to post into this thread with a scheduled 2dr build. Projected ship date is 11 days away so it sure looks like hardtop 2drs are being built now as per the plant timeline. Told I may get it around mid March.
Woohoo! grats. just checked mine just in case. still D.
 

BDJeep1

Well-Known Member
Joined
Nov 7, 2016
Threads
9
Messages
376
Reaction score
395
Location
NW Chicago Suburbs
Vehicle(s)
JL Rubicon on order

J.R. Quimby

Well-Known Member
First Name
Jake
Joined
Dec 23, 2017
Threads
2
Messages
5,230
Reaction score
31,856
Location
Waterville Maine
Vehicle(s)
2004 TJ Sport
Why do you say March is the start date for 2 Doors when Jay's timeline says Feb? Is there new information? It is hard to keep track of the latest info with all the posts on this site.

https://www.jlwranglerforums.com/fo...jl-2-0l-delay-powertop-diesel-dates-etc.1341/
Just ran into a Jeep rep last Thursday and grilled him over lunch. He said the two lanes running JKs will end and those lanes will start running JL Rubi and Sahara, two door production is about to start up in March, and they are focusing on auto trans, and std trans vehicles get made after. So thats all I know word of mouth from an FCA rep I had lunch with days ago.
 

Fred

Well-Known Member
First Name
Fred
Joined
Dec 24, 2017
Threads
6
Messages
1,143
Reaction score
2,914
Location
Murphy, North Carolina
Vehicle(s)
2024 2 door Rubicon X in Anvil
I asked my dealer about my order and here is the reply I received on Tuesday the 12th. The Rubicon was ordered shortly after the sport but too late to stop the sport order.
Hi Fred,

The good news is that yes, the building has begun. I looked into your order & I do see that the first Jeep that we ordered you has a scheduled build week of beginning of March so, I am assuming your Rubicon will soon be scheduled. I will check every day & let you know if anything changes. I also have a few sold-order Wranglers on order that I am anticipating an update on. Keeping fingers crossed!!

Thanks,
 

Sponsored

Powdrmut

Well-Known Member
First Name
Steve
Joined
Dec 13, 2017
Threads
0
Messages
85
Reaction score
145
Location
Long Island, NY
Vehicle(s)
2011 Jeep Grand Cherokee, 2018 JL Rubicon
Hey everybody, just checked status on my Rubicon 2door, hardtop, penestar/8speed, granite crystal ordered 12/19/17. Been in D status 30 Days. No build day set. Hypothetically, if build starts March 1 on my vehicle, our dealer probably won’t see truck for 10-12 weeks. See uploaded screen shot. Very frustrating......

Jeep Wrangler JL 2 DOOR JL build/order discussions master thread 2A7AC2F7-5295-4DBF-8473-17018D0D01B4


Jeep Wrangler JL 2 DOOR JL build/order discussions master thread 71021460-8296-47D1-8FBC-6B93D8208680
 

3uPh0riK

Well-Known Member
First Name
Christiaan
Joined
Jan 15, 2018
Threads
4
Messages
250
Reaction score
400
Location
Seattle Washington
Vehicle(s)
2016 Ford Ranger Wildtrak
Hey everybody, just checked status on my Rubicon 2door, hardtop, penestar/8speed, granite crystal ordered 12/19/17. Been in D status 30 Days. No build day set. Hypothetically, if build starts March 1 on my vehicle, our dealer probably won’t see truck for 10-12 weeks. See uploaded screen shot. Very frustrating......
I also think its somewhat balls that you order a car in December and its expected in the middle of the year. Doesn't seem right to me
 

Powdrmut

Well-Known Member
First Name
Steve
Joined
Dec 13, 2017
Threads
0
Messages
85
Reaction score
145
Location
Long Island, NY
Vehicle(s)
2011 Jeep Grand Cherokee, 2018 JL Rubicon
I also think its somewhat balls that you order a car in December and its expected in the middle of the year. Doesn't seem right to me
Sorry, don’t understand the “somewhat balls” expression. I ordered in Dec.2017 with the full understanding that 2door production would not start till “after the new year”. Kind of vague, from my dealer, but I have no problem with an April dealer delivery. Not complaining, just explaining to other members waiting on two door JLs. Congrats to all the new JLU owners!
 
OP
OP
warc1

warc1

Well-Known Member
Joined
Aug 21, 2017
Threads
11
Messages
381
Reaction score
608
Location
Winnipeg, Canada
Vehicle(s)
2018 2dr JL Rubicon, 2016 Corvette Z06
Hypothetically, if build starts March 1 on my vehicle, our dealer probably won’t see truck for 10-12 weeks.
I'm on the Jeepgarage tracking list and I'm not seeing those kinds of numbers for JLU builds. Nominal times to delivery after build are in the 3 week range. There are recent ones that are as little as two weeks, and I don't think there is any longer than 4 weeks.
 

OldGuyNewJeep

Well-Known Member
First Name
Don
Joined
Sep 21, 2017
Threads
93
Messages
3,993
Reaction score
7,109
Location
CT
Vehicle(s)
2018 Wrangler JL, 2016 Yukon XL
Sorry, don’t understand the “somewhat balls” expression. I ordered in Dec.2017 with the full understanding that 2door production would not start till “after the new year”. Kind of vague, from my dealer, but I have no problem with an April dealer delivery. Not complaining, just explaining to other members waiting on two door JLs. Congrats to all the new JLU owners!
Exactly. I ordered in December knowing I wouldn’t see it until late spring. If dealers were telling folks 6-8 weeks, that’s where your frustration should be aimed. FCA was clear that 2door production wouldn’t start until Q1 sine their big reveal.
Sponsored

 
 







Top