Mordin Solus
Well-Known Member
Looks like what you got there is the same generic answer many of us were being given. Just a week or so ago I got this same answer. I very politely asked to have my inquiry escalated and got an answer back earlier this week saying my build eta was week of the 18th.After escalating on the care line I finally got a bit of info on delays for 2DR:
Our resources indicate your vehicle was ordered with the Premium Sunrider Soft Top. Two-Door Wranglers ordered with this top were slated to begin production in mid-May. Please note, vehicles ordered in December, 2017 will take priority and be built first, followed by vehicles ordered in January - then February and so on.
In another conversation, they told me 2DR builds started on May 7th.
Mine was ordered Apr 6 and still in D.
Aside from the PST do you have more details on the options you chose?
Sponsored