Rubi
Well-Known Member
- First Name
- David
- Joined
- Dec 25, 2016
- Threads
- 3
- Messages
- 447
- Reaction score
- 218
- Location
- Connecticut
- Vehicle(s)
- ‘18 Jeep JLR
Mine says,Mine says, "Scheduling Priority: 1-Sold Order; Build Priority: 01" but still in D and ordered Feb. 1.
Scheduling Priority: 4-Dealer Order
Build Priority: 99
Ordered 3/26, still in D. Anybody understand these Priorities?
Sponsored