I had the same thing. Ordered on 1/11, hit D1 on 2/1 and then backward. I've been back in D1 for a week with no movement. Insanity.You are lucky!! I ordered on 1/31, D somewhere before 2/7, D1 on 2/8, then back to D on 2/23 and there I sit. But according to Jeep chat I never went into D1, there's nothing they can do until I have been in D for 30 days. (currently on day 27) Super frustrated.
What is your build?I don't know if things are speeding up for everybody else too (or if I'm just mentally anchoring only on the horror stories), but I flew through the build/inspection process. Ordered 2/15, D1 a few days later, E yesterday, and now I'm told it is KZ with an ETA of 3/14-3/18 to my dealership in Southern California. I'm a "believe it when I see it" kind of guy, but they've been way faster than all provided estimates so far... If it arrives on schedule, I may actually have a problem with my Tread Lightly affiliate code not being valid yet!
Rubicon UnlimitedWhat is your build?
Nice! Seems not ordering the soft top saved you some time. Good luckRubicon Unlimited
6 Speed
Granite Crystal Metallic
Black Hard Top
LED Lighting Group
Floor mats
I agree. My order date was 2/20 and I am KZ today. Seriously one week and one day. Now, It'll probably fall off the truck and blow up.I don't know if things are speeding up for everybody else too (or if I'm just mentally anchoring only on the horror stories), but I flew through the build/inspection process. Ordered 2/15, D1 a few days later, E yesterday, and now I'm told it is KZ with an ETA of 3/14-3/18 to my dealership in Southern California. I'm a "believe it when I see it" kind of guy, but they've been way faster than all provided estimates so far... If it arrives on schedule, I may actually have a problem with my Tread Lightly affiliate code not being valid yet!
Wow! Some of these orders are flying through. My order from Feb 12th is still d1....maybe my sting gray order will be fasterI agree. My order date was 2/20 and I am KZ today. Seriously one week and one day. Now, It'll probably fall off the truck and blow up.
I don't know if things are speeding up for everybody else too (or if I'm just mentally anchoring only on the horror stories), but I flew through the build/inspection process. Ordered 2/15, D1 a few days later, E yesterday, and now I'm told it is KZ with an ETA of 3/14-3/18 to my dealership in Southern California. I'm a "believe it when I see it" kind of guy, but they've been way faster than all provided estimates so far... If it arrives on schedule, I may actually have a problem with my Tread Lightly affiliate code not being valid yet!
DisregardI agree. My order date was 2/20 and I am KZ today. Seriously one week and one day. Now, It'll probably fall off the truck and blow up.
Only hard top.Dual tops?
Not sure about that.Nice! Seems not ordering the soft top saved you some time. Good luck![]()
As I’ve said before, if we can figure this out, we can rule the world. :cwl: Congratulations!Not sure about that.
My order:
Granite crystal met.
Auto
Cold weather
Infotainment
Trailer tow
Safety
Premium soft top
8 day build!
And now we waitAnybody else who had a fairly quick build: do you see "Special Scheduling Condition VII" at the bottom of your Equipment Listing? Some chatter on other forums about this being somebody within FCA having pull to push my order through despite my dealer not having allocation. Admittedly, that's completely anecdotal and might be complete hogwash.
https://www.jeep.com/webselfservice/BuildSheetServlet?vin=[YOUR_VIN_HERE]