Sponsored

Order Moved to Next Stage (IN PRODUCTION)

GreyhawkToad

Member
First Name
Mark
Joined
Jul 7, 2023
Threads
2
Messages
12
Reaction score
4
Location
Northern IL
Vehicle(s)
Silverado LTZ, Enclave Avenir, Class C RV
Our 2024 Sahara Order Status moved to Scheduled 23 days after it was confirmed. The Tow Harness is still not available according to our salesman who regularly checks when trying to build a new vehicle. Not sure that’s the best way but that’s what I can share. Lastly he said ours was one of the last orders to get pushed through before being impacted by the striker. He indicated it should be built by the end of October. I’m not holding my breath.

UPDATE - Saturday, Dec 16, 2023 - Got the email, then text, then later the status updated! Took 81 Days from Scheduled and 104 Days from Order Confirmed.

UPDATE - Monday, Dec 4, 2023 - My salesperson called and informed me I have a scheduled build date of Dec 21st. 3 months and 1 day since the order was conformed. He thinks we mad see it right around New Year’s Eve. Maybe there is a Santa Claus!

P.S. - Still no tow harness available.

Jeep Wrangler JL Order Moved to Next Stage (IN PRODUCTION) IMG_2345
Sponsored

 
Last edited:

Seemego4WD

Well-Known Member
First Name
Tom
Joined
Dec 24, 2022
Threads
2
Messages
176
Reaction score
401
Location
culpeper, va
Vehicle(s)
2024 JLU xr
a lot of folks in here went schedule on the 28th including me(after 60 days in c)
 

AdamNash

Well-Known Member
First Name
Adam
Joined
May 24, 2019
Threads
18
Messages
167
Reaction score
113
Location
Nashville, TN
Vehicle(s)
2018 Wrangler JLUS
Dumb question, what color and top is your order for? Almost looks like anvil with the SOT. That was my dream combo but didn’t think it was available.
 

Sponsored

OP
OP

GreyhawkToad

Member
First Name
Mark
Joined
Jul 7, 2023
Threads
2
Messages
12
Reaction score
4
Location
Northern IL
Vehicle(s)
Silverado LTZ, Enclave Avenir, Class C RV
Anvil with the SOT and V6. Took patience for Anvil and SOT, and luck for the V6. We didn’t want the 4 turbo but we’re settling for it as this was the only choice from the customer end. When the salesman put the order in on his side, only V6 was available. 🤷 Considering this is our third attempt since March at getting a new Wrangler ordered, I’m delighted BUT cautious ⚠.
 
OP
OP

GreyhawkToad

Member
First Name
Mark
Joined
Jul 7, 2023
Threads
2
Messages
12
Reaction score
4
Location
Northern IL
Vehicle(s)
Silverado LTZ, Enclave Avenir, Class C RV
Built = Assembled at the factory. The harness is listed as an option but not coming up on the dealers side when placing the order, even as of 06Oct.
 
OP
OP

GreyhawkToad

Member
First Name
Mark
Joined
Jul 7, 2023
Threads
2
Messages
12
Reaction score
4
Location
Northern IL
Vehicle(s)
Silverado LTZ, Enclave Avenir, Class C RV
probably something to do with being the end of month (maybe the last Friday) and/or the UAW strike. Fingers crossed….
 

kdj_jeep

New Member
First Name
Kevin
Joined
Sep 17, 2023
Threads
0
Messages
4
Reaction score
1
Location
Massachusetts
Vehicle(s)
2024 Jeep Wrangler Sahara
Mines been sitting on "Order Confirmed" for 2 months now. I'm still waiting.
 

Bigrant

Active Member
First Name
Dave
Joined
Sep 3, 2023
Threads
1
Messages
42
Reaction score
54
Location
New Jersey
Vehicle(s)
2017 Rubicon Recon
So does this mean anvil and sot is open to order for 392? Been waiting for 2 months.
 

Sponsored

AdamNash

Well-Known Member
First Name
Adam
Joined
May 24, 2019
Threads
18
Messages
167
Reaction score
113
Location
Nashville, TN
Vehicle(s)
2018 Wrangler JLUS
Well now I’ve gotta sell my white Rubi 4XE and order an Anvil. 🤣 I figured it still wasn’t available since the website wouldn’t let me build one.
 

GrayHawk20

Well-Known Member
First Name
Cory
Joined
Apr 7, 2021
Threads
11
Messages
1,767
Reaction score
2,110
Location
Florida
Vehicle(s)
*See Signature for Info*
Occupation
(Architectural) Jr. Project Coordinator
Vehicle Showcase
2
Dumb question, what color and top is your order for? Almost looks like anvil with the SOT. That was my dream combo but didn’t think it was available.
Its no available for the Rubicon 392
 

GrayHawk20

Well-Known Member
First Name
Cory
Joined
Apr 7, 2021
Threads
11
Messages
1,767
Reaction score
2,110
Location
Florida
Vehicle(s)
*See Signature for Info*
Occupation
(Architectural) Jr. Project Coordinator
Vehicle Showcase
2
 



Top