Sponsored

Current lead time on new JL order

JFP58

Member
First Name
John
Joined
Dec 17, 2021
Threads
0
Messages
8
Reaction score
10
Location
Frisco, Texas
Vehicle(s)
2020 Wrangler Sport S, 2021 Wrangler Sport S
Occupation
Retired
ordered my moderately equipped 3.6 wrangler sport S unlimited on 9/13 and received it on 12/15. Dealer tried to charge me sticker price, which was $500 more than the number he sent me in September. I fought and he gave in.
Engine on the 2021 seems a bit smoother, especially at idle, than with my 2020 wrangler. Ride is a bit better on the Michelins on this over the Goodyears on my 2020. Glad that I ordered the LED headlights. The standard headlights on the 2020 are pathetic.
Jeep Wrangler JL Current lead time on new JL order AEDC6704-553C-4DA3-B2E4-7300D27342FE
Sponsored

 
Last edited:

LikeAboss

New Member
First Name
D
Joined
Dec 18, 2021
Threads
0
Messages
2
Reaction score
0
Location
Florida
Vehicle(s)
2022 JL
Ordered a JLUR with half doors on 12/13. Anyone know if there are current delays?
 

RAO

Well-Known Member
First Name
Ray
Joined
Nov 3, 2021
Threads
7
Messages
547
Reaction score
709
Location
NC
Vehicle(s)
2015 JKU Sahara; 2022 JL Rubicon
Ordered a JLUR with half doors on 12/13. Anyone know if there are current delays?
No one really knows what the delays will be on the ā€˜22s as production was to start on 12/16; word has it that work in the plant was suspended due to parts not being available
 

zsteffan27

Member
First Name
Zac
Joined
Oct 7, 2021
Threads
0
Messages
12
Reaction score
14
Location
Los Angeles
Vehicle(s)
2021 Jeep Wrangler High Altitude
I ordered a High Altitude in September 2021. I was told by my SoCal dealer that all orders are now being switched to 2022ā€™s. Iā€™m not sure if this is a good thing or bad thing. But for sure it means they most likely havenā€™t started on my build yet and itā€™s been 3 months
 

Sponsored

KAB96F

Well-Known Member
First Name
Kerry
Joined
Oct 2, 2021
Threads
5
Messages
206
Reaction score
350
Location
Richmond, Virginia
Vehicle(s)
2022 Jeep Wrangler Unlimited Rubicon XR
Occupation
Structural Engineer
ordered my moderately equipped 3.6 wrangler sport S unlimited on 9/13 and received it on 12/15. Dealer tried to charge me sticker price, which was $500 more than the number he sent me in September. I fought and he gave in.
Engine on the 2021 seems a bit smoother, especially at idle, than with my 2020 wrangler. Ride is a bit better on the Michelins on this over the Goodyears on my 2020. Glad that I ordered the LED headlights. The standard headlights on the 2020 are pathetic.
Jeep Wrangler JL Current lead time on new JL order AEDC6704-553C-4DA3-B2E4-7300D27342FE
Congratulations! :like: Given the dealer that tried to upcharge you, I hope he gets herpes. I figure its better than wishing him a slow and painful death :LOL:
 

Cowboy from hell

Well-Known Member
Joined
Jul 16, 2021
Threads
27
Messages
520
Reaction score
1,179
Location
The Berkshires
Vehicle(s)
2021 2 Dr Rubicon hydro pearl 6 speed
Still waiting for my goddamn jeep order from july!!! Been in shipping for a month now! Im losing my mind and patience!!!!
 

WannFly

Well-Known Member
First Name
Priyo
Joined
Jul 30, 2021
Threads
14
Messages
297
Reaction score
398
Location
North East Georgia
Vehicle(s)
2021 Rubicon 4Xe - ordered, 2019 RAM 1500
Build Thread
Link
Occupation
Cyber security
Still waiting for my goddamn jeep order from july!!! Been in shipping for a month now! Im losing my mind and patience!!!!
same here.... no idea when its shipping
 

3djedi

New Member
Joined
Jan 8, 2022
Threads
0
Messages
1
Reaction score
0
Location
Kansas
Vehicle(s)
2022 Wrangle Sport
same here.... no idea when its shipping
Ordered a 2022 Wrangle Sport on 10/09/21. Spoke with Jeep today via chat and received this reply: "Thank you so much for holding. I am showing that your order is in the scheduling phase of the manufacturing process. The parts required to build the vehicle are being scheduled and as soon as they are available and ready, the order will be scheduled for the build." I asked for an ETA and was told that there was no ETA. I asked for the average order, build, delivery timeline. Told 7-9 weeks.
 

Megawatt

Well-Known Member
First Name
Joe
Joined
Oct 28, 2020
Threads
15
Messages
632
Reaction score
1,671
Location
Sin City aka Vegas
Vehicle(s)
3 money pits: Turbo Busa, Road King, 22JLUR snazz
Occupation
Powerplant operator
My22 rubi. JLUR

10-21-2021. Deposit and ordered JLUR

10-22-2021. VON -

10-30-2021. VIN - 8844

12-24-2021 build sheet notice from crypto stiker

12-30 -2021 sticker avalaible from crypto sticker

01-06-2022. Still in rail yard

01-08-2022. Shipped. ETA is 18-27 January
Sponsored

 
 



Top