StaceyLynn13
Well-Known Member
It said estimated delivery date of 9/5 yesterday now it says TBD. anyone elses do that?Same here.
Sponsored
It said estimated delivery date of 9/5 yesterday now it says TBD. anyone elses do that?Same here.
My Jeep is built too and it went from 9/5 delivery on the tracker at 11am this morning to saying vehicle built with estimated delivery TBD now when I just checked itCan someone point me to where the Jeep build "codes chart is? I know its here somewhere but I cannot seem to find it! Thanks
sticky thread starting with "Guide:..."Can someone point me to where the Jeep build "codes chart is? I know its here somewhere but I cannot seem to find it! Thanks
Sorry I didn’t meant to reply that to you Broncos fan! But here’s the codes!My Jeep is built too and it went from 9/5 delivery on the tracker at 11am this morning to saying vehicle built with estimated delivery TBD now when I just checked it
I added a comment with the codesCan someone point me to where the Jeep build "codes chart is? I know its here somewhere but I cannot seem to find it! Thanks
Thanks We're in "F" last update from the dealerSorry I didn’t meant to reply that to you Broncos fan! But here’s the codes!
C= tentative schedule
D = firm schedule: serial number assigned
D1 = gateline: unit sequenced for production, est
ship date assigned
Build:
E= framing
F= paint
G= trim
Built:
I = unit built, pending final inspection
J= vehicle passed final inspection but not
released to carrier
JB = shipped to body vendor
JE = shipped to emissions
JJ = consigned to body vendor
JS= shipped to storage
KZ= released by plant and invoiced
Traffic Codes:
KZ L= released but not shipped
KZ M = first rail departure
KZ N = first rail arrival
KZ O= delayed/received
KZ OA = plant hold, quality audit
KZ OB = zone, dealer, sales, vehicle prep, tax,
diversion or derailment hold, dealer refusal, vehicle
diverted
KZ OC = carrier delay, strike-bound, emission or
safety hold, rail car shortage, bad or insufficient
load, inclement weather, need shipping order,
manifest error
KZ OD = mechanical failure, glass damage, vehicle
in repair, lacking parts or storage hold
KZ OE = misdropped or misshipped vehicle
KZ OF = shipped air freight, stolen vehicle
recovered, show vehicle, test info code, vessel
sailed
KZ OG = damaged vehicle, stolen vehicle,
abandon to carrier, vehicle scrapped, donate
KZ OH = all other type carrier codes
kZ R = vehicle within a few days of dealer
KZT= second rail departure
KZ U = second rail arrival
KZX = delivered to dealer
KZ Y1 = major damage must not be sold as new
KZ Y2 = major damage vehicle sold at auction
Thanksticky thread starting with "Guide:..."
I just think the body colored hard top is sexy. And I have a small garage that barely fit my last wrangler(3.5” lift and 37s…clearance was less than an inch) So I figured I would give the freedom Top a try.Why’d you switch to a hard top?
Mine went from an estimated delivery of 9/27 when it went into production, changed to 9/25 yesterday, and went to TBD when I went to built.It said estimated delivery date of 9/5 yesterday now it says TBD. anyone elses do that?
Ahh maybe it will update laterMine went from an estimated delivery of 9/27 when it went into production, changed to 9/25 yesterday, and went to TBD when I went to built.
Seems to be a theme of the day at least, as your build moves into built.
Some of us have been in "F" for quite a while now...?Thanks We're in "F" last update from the dealer
That is what I am thinking to. Now that it is built, they will be able to refine the logistics of transport. I am hoping it just means it will be sooner now that it is built, being the star-eyed optimist about the situation.Ahh maybe it will update later
The dealership I ordered from is only 10 minutes away from the factory. He can see mine is built, he expects it to be here in the next week or so! ?that actually happens!You could be the first one here to get a 2023!