From: OldGuy
Subject: Jeep Order
Date: April 9, 2018 at 1:54:53 PM EDT
To: Dealer Man

Hi, Dealer Man. Rumor has it that 2-door production started, today. Rumor also has it that there may be a material restriction on soft tops and LEDs. Any info on my order, or am I still stuck in "D" status?

From: Dealer Man
Subject: Re: Jeep Order
Date: April 9, 2018 at 2:30:11 PM EDT
To: OldGuy

Hey OldGuy,
Hope all is well. Still D status, but should be changing over very soon. LED's have been on restriction, they are just available at a slower pace. Our 4 Doors got built with them but took a little longer. Still on pace for June arrival.
2-door Rubi
6SP MT
Soft Top
LED

Steel
Leather
Cold Weather
Black Fenders
Proximity
Safety
Upgraded wheels
Probably something else I forgot (it's been 3.5 months, after all ;-)), but no smoker's group, auto, 2.0, hard top, or painted bits.

Ordered 12/23
Sponsored

 

alltimesaresoon

Well-Known Member
First Name
dave
Joined
Feb 21, 2018
Threads
8
Messages
658
Reaction score
1,350
Location
el paso
Vehicle(s)
fiat 124 spider abarth
Now one wonders how many orders for 2 doors are REALLY backlogged from December to March.....and uph of Toledo 2 doors
 

alphacc82

Active Member
Joined
Feb 17, 2018
Threads
0
Messages
33
Reaction score
21
Location
FL
Vehicle(s)
2018 Wrangler JLU - Punk'n
Just got word from my dealer than I am scheduled to be built. He said two door production has started today, BUT the initial run is going to be the turbo model(like some of the rumors have been). It was stated that a time frame for the v6 has not been given so its probably going to be more waiting. ~Sport S with an auto and most of the packages.

Edit: well i asked for clarification and its still "D" so this doesnt really mean anything for me at this point :(
 
Last edited:

alltimesaresoon

Well-Known Member
First Name
dave
Joined
Feb 21, 2018
Threads
8
Messages
658
Reaction score
1,350
Location
el paso
Vehicle(s)
fiat 124 spider abarth
Just got word from my dealer than I am scheduled to be built. He said two door production has started today, BUT the initial run is going to be the turbo model(like some of the rumors have been). It was stated that a time frame for the v6 has not been given so its probably going to be more waiting. ~Sport S with an auto and most of the packages.
here is something interesting.. the 6 D1's we have on the order tracker spreadsheet all appear to me to be 3.6L V6. 8th digit is usually engine and they all have a G which matches my 3.6L order VIN with a G in that spot.

that doesnt mean those will go from D1 to mfg today or this week, but one would THINK that the vehicles getting D1 would be before the ones that aren't going D1 on the tracker. and i don't see any turbos on the tracker (2 door)....
 

Sponsored

alltimesaresoon

Well-Known Member
First Name
dave
Joined
Feb 21, 2018
Threads
8
Messages
658
Reaction score
1,350
Location
el paso
Vehicle(s)
fiat 124 spider abarth
there are several N digit 4 doors on the tracker, but 0/6 in the 2 door category....
 

AdHerp

Well-Known Member
First Name
Robert
Joined
Feb 20, 2018
Threads
1
Messages
167
Reaction score
251
Location
Toledo
Vehicle(s)
2015 Jk -> 2018 JL
here is something interesting.. the 6 D1's we have on the order tracker spreadsheet all appear to me to be 3.6L V6. 8th digit is usually engine and they all have a G which matches my 3.6L order VIN with a G in that spot.

that doesnt mean those will go from D1 to mfg today or this week, but one would THINK that the vehicles getting D1 would be before the ones that aren't going D1 on the tracker. and i don't see any turbos on the tracker (2 door)....
:giggle: G spot :giggle:
 

jeeperJB

Well-Known Member
First Name
John
Joined
Feb 10, 2018
Threads
0
Messages
50
Reaction score
136
Location
Harrisburg, PA
Vehicle(s)
2016 Willys
Just received word from a person who works the line that the 2 doors have NOT started today. They were not given any new updates!
 

travelboysteve

Well-Known Member
First Name
Steve
Joined
Feb 4, 2018
Threads
4
Messages
173
Reaction score
147
Location
Cali
Vehicle(s)
Escape, Fusion, ProMaster Van, FR3 MH
Sweeeeeeeeeet,....

I'm a February order, just have to wait until July to get it I guess.

:)
 

Sponsored

Sweetwater

Guest
Just received word from a person who works the line that the 2 doors have NOT started today. They were not given any new updates!
No your friend is not correct. My Info came from a very reliable upper management at the assembly plant.
I would not have posted a JL 2Dr start if I did not have firm Info.
 

alltimesaresoon

Well-Known Member
First Name
dave
Joined
Feb 21, 2018
Threads
8
Messages
658
Reaction score
1,350
Location
el paso
Vehicle(s)
fiat 124 spider abarth
No your friend is not correct. My Info came from a very reliable upper management at the assembly plant.
I would not have posted a JL 2Dr start if I did not have firm Info.
i think jeeperJB is trolling you
 

Rubi1818

Member
First Name
Harry
Joined
Mar 23, 2018
Threads
0
Messages
8
Reaction score
9
Location
Freehold, New Jersey
Vehicle(s)
2012 Jeep Wrangler Sport
Occupation
CFO of Law Firm NYC
Glad they started 2DR production. I wonder how many 2DR orders they have received. Seems like more and more are moving to the 4DR's.
 
OP
OP
warc1

warc1

Well-Known Member
Joined
Aug 21, 2017
Threads
11
Messages
381
Reaction score
608
Location
Winnipeg, Canada
Vehicle(s)
2018 2dr JL Rubicon, 2016 Corvette Z06
here is something interesting.. the 6 D1's we have on the order tracker spreadsheet all appear to me to be 3.6L V6. 8th digit is usually engine and they all have a G which matches my 3.6L order VIN with a G in that spot.

that doesnt mean those will go from D1 to mfg today or this week, but one would THINK that the vehicles getting D1 would be before the ones that aren't going D1 on the tracker. and i don't see any turbos on the tracker (2 door)....
Ralph2018JL, who is one of the six D1's, says his build date is April 19 (note that estimated ship date actually means estimated build date). That means that at least some of the initial six are not in the first build week. I point this out because it's still quite likely that 2.0T are being prioritized for the first week. Doesn't mean they're exclusive on the line, but likely have a higher proportion compared to the percentage ordered. I can see FCA preferring to debug the introduction of a new model and new engine at the same time rather than spreading that disruption out.