Sponsored

ORDER TRACKING for your Jeep Wrangler

Status
Not open for further replies.

Shay.Bear

Active Member
First Name
Amanda
Joined
Dec 28, 2017
Threads
0
Messages
31
Reaction score
106
Location
Orlando florida
Vehicle(s)
Mazda 6
@Shay.Bear What exactly did you order and color? You ordered your jeep more than a month after some of us still in D1. And Congratulations!
Thank you! My build is a black Sport S, auto trans, technology package, and a hard top. I really don’t understand the rhyme or reason to their building process, especially when people have ordered and been waiting quite some time
Sponsored

 

Mattyp1214

Well-Known Member
First Name
Matt
Joined
Oct 27, 2017
Threads
21
Messages
836
Reaction score
608
Location
USA
Vehicle(s)
Black 2018 JLUR
Ordered Jan 4th, and is in “D1” status now.

Does anyone know how much longer I must wait until my JLUS arrives?
Mine hit KZ two weeks ago, so once they start building it 3-4 weeks
 

Sponsored

Mattyp1214

Well-Known Member
First Name
Matt
Joined
Oct 27, 2017
Threads
21
Messages
836
Reaction score
608
Location
USA
Vehicle(s)
Black 2018 JLUR
its kinda crazy the amount of orders from October on the spreadsheet that haven’t been started yet, cancelled Orders maybe?
 

Nick80

Well-Known Member
First Name
Nicholas
Joined
Dec 23, 2017
Threads
18
Messages
114
Reaction score
155
Location
VA
Vehicle(s)
2018 JLU Rubicon & 2010 Jeep Commander
I don’t see code EIN Jeep chat said that’s my current status.
 

banessi

Well-Known Member
First Name
Blair
Joined
Nov 13, 2017
Threads
6
Messages
334
Reaction score
535
Location
Ellicott City, MD
Vehicle(s)
2018 Wrangler JLU Rubicon (Hard Top, Granite), 2013 Wrangler JK Sahara (Soft Top, Commando Green)
Vehicle Showcase
3
12-18, so I went to D1 after a month of having a VIN and VON.
I ordered 12/4 and just went to D1 last week. I’m blaming proximity but who knows. My dealer said they have had cars still showing as D1 in FCA show up on the lot. The exception to the rule but it has happened.
 

Sponsored

leafsfan1970

Well-Known Member
Joined
Sep 24, 2017
Threads
2
Messages
103
Reaction score
162
Location
Canada
Vehicle(s)
2015 sahara unlimited
its kinda crazy the amount of orders from October on the spreadsheet that haven’t been started yet, cancelled Orders maybe?
I was thinking the same thing . It’s crazy how many are still waiting for their builds to start .
 

shultz01

Well-Known Member
First Name
Andy
Joined
Dec 11, 2017
Threads
3
Messages
71
Reaction score
125
Location
Harrisburg, PA
Vehicle(s)
2018 JLUR, 1999 TJ Sahara
Vehicle Showcase
2
Not sure if yours will go quicker. Mine shipped by rail on the 15th to Baltimore and then trucked up to PA. Being told should arrive at dealership around the 30th.
Well first I have to go through the rest of the alphabet soup and get to KZ.
How many days was it for you from built until it was loaded on a rail car?
 

Mattyp1214

Well-Known Member
First Name
Matt
Joined
Oct 27, 2017
Threads
21
Messages
836
Reaction score
608
Location
USA
Vehicle(s)
Black 2018 JLUR
Well first I have to go through the rest of the alphabet soup and get to KZ.
How many days was it for you from built until it was loaded on a rail car?
I hit KZ on 1/10 and 1/17 is said railcar loaded/departure. My ETA is 1/25-1/30. So roughly 3 weeks to get to dealer once built. I think this will speed up though, the average looking at jk forums from last year looked like an average of 2 weeks once it hit KZ. They probably just have a lot waiting in line to get on the rail cars right now to get the initial allocations out.
 

wired

Well-Known Member
Joined
Oct 7, 2017
Threads
18
Messages
425
Reaction score
563
Location
usa
Vehicle(s)
2018 JLUR Red with soft top
Lately has been pretty consistent 4 days from E to KZ, but then no consistency at all from KZ to shipping. Some stuck in ‘paper hanging ‘ for a week, some ship 2 days after KZ. The whole process likely depends on factors we can’t figure out, or is just random.
There was a request to put your order date and build and movements in your signature to help decode it, if possible.
 

Jefferyjrt

Member
First Name
Jeff
Joined
Jan 10, 2018
Threads
0
Messages
20
Reaction score
36
Location
York, PA
Vehicle(s)
2011 jku sport s, 2018 jlu Sahara
Well first I have to go through the rest of the alphabet soup and get to KZ.
How many days was it for you from built until it was loaded on a rail car?
If you can believe how it was coded into the system was correct i was told in paint on 11th, trim 12th and on rail the 15th. I suspect might’ve just been sitting in railyard the 15th and not actually moving towards Baltimore
Sponsored

 
Status
Not open for further replies.
 







Top