Jeep4Life
Well-Known Member
Sponsored
Same here...Had a good explanation (for a change) from dealer chat for my current status in JB:
Sarah: I am showing your Vehicle has been built and is pending installation of additional equipment.This is a necessary step when additional features or optional equipment packages are added to the vehicle. Currently no dealer ETA is available.
I am assuming that’s tied to Mopar options. In my case floor mats and headliner might be the hold up.
Tonight’s update has me at KZ now, you? I went to JB on Thursday so that was 5 days.Same here...
Haven’t checked yet... last I knew I had been in JB for 3 daysTonight’s update has me at KZ now, you? I went to JB on Thursday so that was 5 days.

This was a really good thought. I poked around, and the peak is months before CNY. Now should actually be a quiet time that you’d think manufacturers would want to rush because of lower rates.I think the railcar shortage is due to Chinese New Year starting Feb 16th. Hugh increase in intermodal cargo prior to their big holiday.
Read the first post in this thread. It answers this question and more.Good evening! Will you be opening the spreadsheet up to more members as others receive their jeeps?
Right. They don’t install a handful of these low running options on the main line to keep it running full speed. Mine went over there for the dual tops. They install the hard top on the main line and stuff the soft top (in a box) in the back seat / cargo area offline. Your probably right that the all weather mats are installed there as well.Had a good explanation (for a change) from dealer chat for my current status in JB:
Sarah: I am showing your Vehicle has been built and is pending installation of additional equipment.This is a necessary step when additional features or optional equipment packages are added to the vehicle. Currently no dealer ETA is available.
I am assuming that’s tied to Mopar options. In my case floor mats and headliner might be the hold up.
I did read it and it said as of 1/4, it was currently closed. I was wondering if it was going to open back up as orders were received.Read the first post in this thread. It answers this question and more.
That’s the problem. The main line is ramping up (with lots of little issues) while the repair, optional equipment and shipping areas aren’t keeping up. But don’t worry, It won’t ship to you with a single known open issue.Yeah...but 21 days?
They've made thousands and thousands of JLURs in 21 days, why does it take this long to fix a paint issue?
I really hope the car will be flawless, because I will not accept it if it is not.