I ordered a JLUR on May 7. I sent an email to [email protected] and received this response:
"Scheduled – All of the materials needed to start the manufacturing build process are being received and the vehicle should be entering the build process very soon."
What does this mean? D1? D? C?
Also, despite that I ordered on May 7, the email says that this is the status as of "April 20" so who knows if they even have the correct vehicle...
"Scheduled – All of the materials needed to start the manufacturing build process are being received and the vehicle should be entering the build process very soon."
What does this mean? D1? D? C?
Also, despite that I ordered on May 7, the email says that this is the status as of "April 20" so who knows if they even have the correct vehicle...