Chinarider
Well-Known Member
- Joined
- Mar 30, 2018
- Threads
- 1
- Messages
- 52
- Reaction score
- 28
- Location
- California
- Vehicle(s)
- 2012 JKU Sahara, 2018 JLU Rubicon,
I'm going to add one here, on the assumption that my delays are TRMS related as well. I ordered my JLUR on 3/27. Saw TRMS as dealer and I were going through & checking off options - figured why not? Very much a last-minute thing. Was issued a VON & then the VIN by 3/30. Things looked good for a while...
Anyway, long story short, went from D status to D1, with a ship date of June 8th. June 8th came and went & no build sheet! Called again this morning and I'm back down to D status.... WTF FCA?
Of course, mine also includes premium soft top (known delay), LED lights (known delay), manual transmission (known delay)...
At what point does this go from a 2018 model to a 2019? Very curious about that.
Anyway, long story short, went from D status to D1, with a ship date of June 8th. June 8th came and went & no build sheet! Called again this morning and I'm back down to D status.... WTF FCA?
Of course, mine also includes premium soft top (known delay), LED lights (known delay), manual transmission (known delay)...
At what point does this go from a 2018 model to a 2019? Very curious about that.
Sponsored