Ratbert
Well-Known Member
- First Name
- John
- Joined
- Jun 20, 2020
- Threads
- 88
- Messages
- 7,639
- Reaction score
- 10,278
- Location
- COS region, CO
- Vehicle(s)
- AEV JL370 JLURD , AMG GLC43
- Build Thread
- Link
- Occupation
- Software Engineer
- Thread starter
- #16
An average of 3 days between build sheet and window sticker for Altitudes vs 2.8 overall. Slight increase, but probably not significant.I imagine all Altitudes end up in JB at some point in time for the hardtop headliner?
Sponsored