Headbarcode
Well-Known Member
- First Name
- Mike
- Joined
- Aug 16, 2018
- Threads
- 26
- Messages
- 7,782
- Reaction score
- 17,834
- Location
- LI, New York
- Vehicle(s)
- 2019 JLUR Stingray 2.0 turbo
- Vehicle Showcase
- 1
Installing LOD parts always turns into a 2 day affair. By the time they finally get unpacked, I'm worn out and have to call it a night.+1 For LOD's packaging. I too ordered their Destroyer frame mounted step/slider, and I've NEVER seen better packaging!
LOD certainly doesn't cheap out on packaging. I hope to one day be buried in such a high quality box.
Sponsored