Claptovaughn
Active Member
- Joined
- May 2, 2018
- Threads
- 3
- Messages
- 31
- Reaction score
- 8
- Location
- California
- Vehicle(s)
- 2018 Jeep Wrangler Rubicon 2-Door 6-Speed
- Thread starter
- #1
I ordered my JL on July 2nd. It went through the first few build stages fairly quickly, and then it hit "I" status for inspection. It sat there for over a month until I was told by my salesman (customer service only told me to keep waiting as this was somewhat "normal") told me a new vin was issued.
Now I've been told that my new VIN has an build ETA of mid-October. I'll be lucky to receive this vehicle 4 months after I ordered it, and I'm sure the Thanksgiving period is a fantastic time to be expecting prompt deliveries.
I know a lot of people have been stuck in I status and had new vins re-issued, but did the second vin still take that long?
This is what I ordered:
Rubicon
2-door
Manual transmission
Firecracker Red
LED lighting group
That's it, nothing else added to the vehicle.
Now I've been told that my new VIN has an build ETA of mid-October. I'll be lucky to receive this vehicle 4 months after I ordered it, and I'm sure the Thanksgiving period is a fantastic time to be expecting prompt deliveries.
I know a lot of people have been stuck in I status and had new vins re-issued, but did the second vin still take that long?
This is what I ordered:
Rubicon
2-door
Manual transmission
Firecracker Red
LED lighting group
That's it, nothing else added to the vehicle.
Sponsored