TJO
Well-Known Member
That is a good theory but I noticed all of them have vastly different eta's. Also, I believe the deliveries already made to maryland were all trucked over, not sure about pa. I work in the logistics industry so I have a little knowledge about rail company's. They typically do not move a train unless they have a minimum of 200 rail cars. Not sure how many vehicle they can put on one rail car but that is a lot. I am assuming Chrysler will be putting more then just jeeps on the rail though. Are there any other Chrysler products manufactured in OH?@shultz01 ...good stuff. That makes a dozen "northeast" destinations... I don't know much if anything at all about railcar deliveries, what constitutes "full", or if we'll be on the same train... but 12 SUVs heading to the same proximity should justify release. I only wonder what the railcar schedule is... this has been a rough wait... but I've been patient.
Sponsored