Bbino
Active Member
- Joined
- Feb 3, 2019
- Threads
- 3
- Messages
- 41
- Reaction score
- 24
- Location
- Jacksonville FL
- Vehicle(s)
- 1997 TJ Wrangler Sport, 2019 JLU Rubicon, 2008 BMW M5
I ordered the day after you (4/25) and as of Friday (6/7) I was in the shipping process. My specs are similar to yours:Ordered my first Wrangler on 4/24/19. Entered D1 on 4/26. On Thursday (6/6) I was still in D1 according to Jeep Chat and was told to check back on Monday (6/10) for an update. From what I understand the color is one of the main factors that determine when your order will start along with the engine and maybe transmission. I'm curious what colors have been built this past week compared to colors that have not.
For those of you that progressed from D1 after the shutdown ended on 6/3 and for those that are still in D1, what are your main specs. that would affect the timing of production? Here is mine:
Ordered 4/24
D1 on 4/26
Still D1 on 6/6 (42 days)
4-door Rubicon
Granite Crystal
3.6 Manual Trans.
BTW, I was told by Jeep Chat a couple weeks ago that it would not stay in D1 for more than 30 days. And then told last week it would not stay in D1 more than 45 days. Tomorrow is the 46th day. Ugh.
JLUR
Granite Crystal
3.6 manual