JL Window Sticker and Build Sheet Order Tracking

Ratiogear

Well-Known Member
First Name
Justin
Joined
Apr 15, 2021
Messages
230
Reaction score
396
Location
DFW
Vehicle(s)
2021 4xe Rubicon
I signed up for brochure and updates. They're different. Signed up for mailed brochure, they have a download one as well and I also signed up for electronic updates. Not sure which one did the trick. Plus I signed up several times.
Was not aware of the sign up for updates.

For anyone else who was like me, it's jeep.com/sufu.html, and of course jeep.com/gab.html



Advertisement

 

Bku9929

Member
Joined
May 24, 2021
Messages
23
Reaction score
19
Location
NJ
Vehicle(s)
2021 Defender 110
Thought I’d post my build timeline:
Ordered: 5/20
VON/VIN: 5/24
Build sheet: 6/3
Window Sticker: 6/5

currently shipping with no ETA yet.
 

WrekEE

Well-Known Member
First Name
Dennis
Joined
Oct 4, 2019
Messages
49
Reaction score
35
Location
Colorado
Vehicle(s)
17 Raptor, 21 JLUR Rubicon 4xe (ordered 5/24)
Thought I’d post my build timeline:
Ordered: 5/20
VON/VIN: 5/24
Build sheet: 6/3
Window Sticker: 6/5

currently shipping with no ETA yet.
What is your build? Rubi? 3.6?
 

K-nuk

Well-Known Member
First Name
Scott
Joined
Jun 30, 2019
Messages
166
Reaction score
141
Location
Florida
Vehicle(s)
JLUR, CJ7
I got a sticker today as well with a 6/2-6/16 delivery date. My Jeep has half doors as well so I’m kind of shocked I wasn’t in a holding pattern for a month.
@ShaunBJeeps I’m happy for you but so jelly…. I think you posted that you ordered a JLURD on 5/11 with half doors. That is what I ordered on 5/1 and no progress beyond JB. This is what I got from JeepChat this morning…


April (6/6/2021, 11:41:26 AM): The Production team is investigating the vehicle in the same status for 3 weeks

April (6/6/2021, 11:42:58 AM): However , we do not have set time frames on the stages, and this is still within the regular time frame of building. So they may not find anything new out about this build. It does take 7-9 weeks in total for the build and then shipping. Now this was ordered ORD 05-01-21 , and we are still within the 7-9 weeks time frame for the build

Me (6/6/2021, 11:44:17 AM): Yes I see that. It was built and awaiting accessories (JB) on 5/18?

April (6/6/2021, 11:44:30 AM): it says pending additional equipment, so im not sure what packages were added

April (6/6/2021, 11:45:02 AM): yes it says it enteres this stage 5/18/21

Me (6/6/2021, 11:45:02 AM): I ordered half door package. Is that an issue?

April (6/6/2021, 11:45:43 AM): no i dont think so, we have had other orders with that same package, and it is a bit longer, but no real delays on the shipping

April (6/6/2021, 11:46:29 AM): so i think if we allow the build to continue and in the next week or so we should see it go right into shipping and then we will have an ETA to the Dealer for you

Me (6/6/2021, 11:47:00 AM): Ok thanks I’ll check back in a few days.

1622997093452.png
 

ShaunBJeeps

Well-Known Member
First Name
Shaun
Joined
May 4, 2021
Messages
50
Reaction score
65
Location
Cullman, AL
Vehicle(s)
1998 Jeep Grand Cherokee X4, 2017 GMC Sierra
yes. I ordered 5/11. I’m really surprised how quickly mine went through JB status. Maybe you’ll get an update soon. I too wonder if the dealer has anything to do with it. I ordered from Gupton who sends lots of orders. I have a friend who ordered same day as me (but no half doors) and he got his window sticker last week.

@ShaunBJeeps I’m happy for you but so jelly…. I think you posted that you ordered a JLURD on 5/11 with half doors. That is what I ordered on 5/1 and no progress beyond JB. This is what I got from JeepChat this morning…


April (6/6/2021, 11:41:26 AM): The Production team is investigating the vehicle in the same status for 3 weeks

April (6/6/2021, 11:42:58 AM): However , we do not have set time frames on the stages, and this is still within the regular time frame of building. So they may not find anything new out about this build. It does take 7-9 weeks in total for the build and then shipping. Now this was ordered ORD 05-01-21 , and we are still within the 7-9 weeks time frame for the build

Me (6/6/2021, 11:44:17 AM): Yes I see that. It was built and awaiting accessories (JB) on 5/18?

April (6/6/2021, 11:44:30 AM): it says pending additional equipment, so im not sure what packages were added

April (6/6/2021, 11:45:02 AM): yes it says it enteres this stage 5/18/21

Me (6/6/2021, 11:45:02 AM): I ordered half door package. Is that an issue?

April (6/6/2021, 11:45:43 AM): no i dont think so, we have had other orders with that same package, and it is a bit longer, but no real delays on the shipping

April (6/6/2021, 11:46:29 AM): so i think if we allow the build to continue and in the next week or so we should see it go right into shipping and then we will have an ETA to the Dealer for you

Me (6/6/2021, 11:47:00 AM): Ok thanks I’ll check back in a few days.

1622997093452.png
 

K-nuk

Well-Known Member
First Name
Scott
Joined
Jun 30, 2019
Messages
166
Reaction score
141
Location
Florida
Vehicle(s)
JLUR, CJ7
yes. I ordered 5/11. I’m really surprised how quickly mine went through JB status. Maybe you’ll get an update soon. I too wonder if the dealer has anything to do with it. I ordered from Gupton who sends lots of orders. I have a friend who ordered same day as me (but no half doors) and he got his window sticker last week.
I think you mentioned you’re in JAX, FL? I’m near Tampa FL, ordered from Lakeland. I’ve no idea how big either is relative to units ordered.
 

ShaunBJeeps

Well-Known Member
First Name
Shaun
Joined
May 4, 2021
Messages
50
Reaction score
65
Location
Cullman, AL
Vehicle(s)
1998 Jeep Grand Cherokee X4, 2017 GMC Sierra
I think you mentioned you’re in JAX, FL? I’m near Tampa FL, ordered from Lakeland. I’ve no idea how big either is relative to units ordered.
I’m in north Alabama and ordered from Gupton in Tennessee.
 

K-nuk

Well-Known Member
First Name
Scott
Joined
Jun 30, 2019
Messages
166
Reaction score
141
Location
Florida
Vehicle(s)
JLUR, CJ7
I’m in north Alabama and ordered from Gupton in Tennessee.
Gotcha. Well hey, enjoy! I’m looking forward to the half doors. I’ve got tube doors for my current JLUR and love them … except in the rain which can happen absolutely any day (almost every day) 3pm to 6pm here from June to November. Half doors with uppers are perfect for this climate.
 

StormyMidwest

Well-Known Member
First Name
Kelly
Joined
May 26, 2021
Messages
178
Reaction score
174
Location
IL
Vehicle(s)
2021 JLU High Altitude, Granite (ordered 5/11/21)
Ordered 5/11 still in D 😢😂🤦‍♂️
Same!

What did you order?

JLU High Altitude in granite
3.0 Ecodiesel
Cold, advanced tech, tow packages
Gray leather interior
Sky one touch roof

Ordered 5/11
Has been in D for 3 weeks
 

Cypher

Well-Known Member
First Name
J
Joined
Feb 8, 2018
Messages
2,110
Reaction score
1,860
Location
AZ
Vehicle(s)
2021 JLUR Eco-Diesel now. 18, 19, 20 JLUR 3.6 old.
Occupation
Cybersecurity Leader
Vehicle Showcase
5
Did either of you happen to order gorilla glass by chance?
I have been watching the build sheet tracker, not a lot of 3.0s getting built either. so maybe I am suffering from multiple hold-ups, 3.0, trail cam, Hardtop headliner, and Gorilla glass.
 

nomographer

Well-Known Member
Joined
Oct 7, 2020
Messages
1,713
Reaction score
5,621
Location
Seattle, WA
Vehicle(s)
21 Rubicon ("Anaximander"), 94 YJ sold :(
Build Thread
Link
Summary
Total records4175
With sticker3358
Build started2266
Open645

percentiles-request-to-build.png


Past Year
Request-to-Build daysBuild-to-Sticker days
28.69.7Overall
23.715.5Model 2021 Jeep Wrangler Sahara Unlimited 4xe Sport
26.86.6Model 2021 Jeep Wrangler Rubicon Unlimited
27.219.2Model 2021 Jeep Wrangler Rubicon Unlimited 4xe Sport
28.0Model 2021 Jeep Wrangler Rubicon Unlimited Rhd
29.45.5Model 2021 Jeep Wrangler Sport Unlimited
30.74.9Model 2021 Jeep Wrangler Sahara Unlimited
31.66.6Model 2021 Jeep Wrangler Sport
32.69.2Model 2021 Jeep Wrangler Rubicon
34.04.8Model 2021 Jeep Wrangler Sport Unlimited Rhd
50.112.5Model 2021 Jeep Wrangler Rubicon Unlimited 392
27.212.6Engine 2.0l Turbo
27.76.3Engine 3.0l Turbo
30.37.1Engine 3.6l Pentastar
50.112.5Engine 6.4l Hemi
28.36.2Doors 4
32.07.9Doors 2

Lag
(Relative to model average)
(Property appears in >2% of builds)
(Request-to-Build more than 1.0 days from average)
(Properties do not necessary cause delays; a related feature may be the culprit)
Request-to-BuildBuild-to-Sticker
-4.84-0.6218x7.5 Granite Crystal Alum Wheels
-2.50-0.642.0l I4 Dohc Di Turbo Engine W/ Ess
-1.66-1.283.6l V6 24v Vvt Etorque Engine Upg I
-1.430.8818x7.5 Gloss Black Alum Wheels
-1.430.88Altitude Package
-1.31-1.63High Altitude Package
-1.09-0.12Dual Top Group
-1.051.15Front Mopar Grab Handles
-1.051.15Mopar Grab Handle Kit
-1.03-0.59All Automatic Transmissions
-1.031.53Body Color 3-piece Hard Top
0.000.00Spring - Left Front
1.1313.88Dual Door Group W/ Premium Uppers
1.200.32Mopar Cargo Tub Liner
1.4014.61Half Doors W/ Uppers
1.810.94Engine Block Heater
1.940.53Lt285/70r17c Bsw M/t Tires
2.30-0.10245/75r17 All-terrain Tires
2.301.35Black Sunrider Soft Top
4.492.873.6l V6 24v Vvt Engine Upg I W/ess
4.522.87All Manual Transmissions
5.011.71Uconnect 3 With 5" Display
5.384.87Mopar Stitched Leather Black
10.291.15D1-to-d Regress

Open Orders
Days since request, no build sheet nor sticker, request in the last 100 days
p20: 13
p40: 22
p60: 32
p80: 52
p90: 72
p95: 87
p100: 97

Other Investigations
The request to build graph explained
Delays over time
Property standard deviations
(Very) slow orders
Build days histogram
What it really means for something to be "slower"
 

Advertisement



Advertisement
Quake LED
 
Advertisement
Top