JL Window Sticker and Build Sheet Order Tracking

Silvertoy

Well-Known Member
First Name
Owen
Joined
Jun 23, 2021
Messages
46
Reaction score
51
Location
Dallas, PA
Vehicle(s)
2021 4xe Sahara
They said August for the XR builds. I'm sure they'll jump right on it this weekend. So I should expect delivery by next Saturday right :)
Sol I've seen this XR reference multiple times, what does that stand for? Is there an acronym sticky I missed somewhere?



Advertisement

 

Jank4AU

Well-Known Member
First Name
Steve
Joined
Mar 14, 2019
Messages
414
Reaction score
434
Location
Alabama
Vehicle(s)
2018 JLU Sport S
Last edited:

Rscx4

Well-Known Member
First Name
Scott
Joined
Jul 19, 2021
Messages
58
Reaction score
153
Location
Tampa, FL
Vehicle(s)
21 JLUR 392 (on order) 762563

SteveTigers

Well-Known Member
First Name
Steve
Joined
Dec 28, 2020
Messages
97
Reaction score
100
Location
Midway, MO
Vehicle(s)
2021 4xe
Im sorry but….. what the heck is this graph telling me?
For example: p40 = 40% of all produced vehicles. So 30 days ago they were making 40% of the Jeep orders in Toledo in 20 days. It is now taking 55 days. The plant was shut down last week, so that added 7 days. It explains part of the delay. The increase before then 🤷‍♂️
 

Jeepgirl59

Well-Known Member
First Name
Bonnie
Joined
Jul 9, 2021
Messages
105
Reaction score
126
Location
shippensburg, pa
Vehicle(s)
04 Dodge Ram, 2014 Dodge Challenger
Of orders with no build sheet nor sticker on cryptostickers.net:
10% have been open for at least 78 days
20% have been open for at least 57 days
40% have been open for at least 41 days
60% have been open for at least 32 days
90 days for me.
 

rkwfxd

Well-Known Member
First Name
Rich
Joined
May 24, 2021
Messages
341
Reaction score
440
Location
Whittier
Vehicle(s)
2020 Tahoe 4x4, 2018 4Runner 4X4, 1990 Porsche 964
For example: p40 = 40% of all produced vehicles. So 30 days ago they were making 40% of the Jeep orders in Toledo in 20 days. It is now taking 55 days. The plant was shut down last week, so that added 7 days. It explains part of the delay. The increase before then 🤷‍♂️
Got it! Thanks. Now Im kind of sorry I asked. Its a bit discouraging.
 

galleywinter

Well-Known Member
First Name
Tod
Joined
Dec 10, 2017
Messages
484
Reaction score
902
Location
Fayetteville, Arkansas
Vehicle(s)
2015 Hard Rock JKU, 2018 JL Rubi, 2020 Mercedes GLC 300(Wife) :-)
Occupation
Environmental Manager, VA Hospital
That's the Xtreme Recon package Jeep came out with since Bronco has the Sasquatch. Shorter gears, factory lift, 35's, 17x8" bead lock wheels, $3,995 +/-.

"Jeep Wrangler Rubicon Xtreme Recon Package Goes Sasquatch Hunting" https://www.caranddriver.com/news/a...-xtreme-recon-package-goes-sasquatch-hunting/
Silver, yep, what Jank4AU said. Ordered in late June but they don't start the XR package until August and knowing Jeep it won't be Aug. 1, it will be October 20th :) Terrible name for the package BTW. Thankfully there won't be any Xtreme Recon stickers or badging on it.
 

echelon37

Active Member
Joined
Jun 11, 2021
Messages
27
Reaction score
34
Location
SC
Vehicle(s)
2021 JL Rubicon
They told me that loans must be maintained through 7 billing cycles.
I just read my full finance contract, word for word, every page. There is NO mention about a minimum number of payments required to pay it off (which is what a refinance is to them). Nor does it even mention refinance.

So, read your contracts. Mine very clearly says there is no penalty for early payoff. I'll be starting the refinance next week, and I took delivery from Gupton last Friday.
 

WrekEE

Well-Known Member
First Name
Dennis
Joined
Oct 4, 2019
Messages
46
Reaction score
33
Location
Colorado
Vehicle(s)
17 Raptor, 21 JLUR Rubicon 4xe (ordered 5/24)
I just read my full finance contract, word for word, every page. There is NO mention about a minimum number of payments required to pay it off (which is what a refinance is to them). Nor does it even mention refinance.

So, read your contracts. Mine very clearly says there is no penalty for early payoff. I'll be starting the refinance next week, and I took delivery from Gupton last Friday.
Some of them do. I remember along time ago when i purchased a car and they found me a finance offer that beat my credit union, they said I would have to wait 3 billing cycles before paying it off.
 

WillysU

New Member
First Name
Tracy
Joined
Jul 29, 2021
Messages
4
Reaction score
12
Location
SW Michigan
Vehicle(s)
2021 JLU Willys
Ordered my Willys Unlimited: 6/14
Estimated Ship date (aka build date): 7/21
Actual Build Date: 7/21
Actual Ship Date: 7/23
ETA to Dealer: 7/31 - 8/13
Should arrive right around the 8 week mark. Dealer originally estimated 6-8 weeks.
I ordered my Willys Unlimited on 6/14 too. Unfortunately, my dealer didn't provide the VON or VIN so I can't be certain that the dealer placed the order on that day. He updated me Tuesday to say that it's being built this week and should arrive Aug 10-20.
 

echelon37

Active Member
Joined
Jun 11, 2021
Messages
27
Reaction score
34
Location
SC
Vehicle(s)
2021 JL Rubicon
Some of them do. I remember along time ago when i purchased a car and they found me a finance offer that beat my credit union, they said I would have to wait 3 billing cycles before paying it off.
They said, or the contract said?

Gupton is in TN, and TN law actually addresses pre-payment restrictions and penalties in state code. They require the following if a pre-payment restriction or penalty exists on any loan....

  • shall state on its face in at least ten (10) point bold type in language separated from the other language in the contract by bold print dividing lines that it cannot be prepaid or that there is a penalty for prepayment.
 

WrekEE

Well-Known Member
First Name
Dennis
Joined
Oct 4, 2019
Messages
46
Reaction score
33
Location
Colorado
Vehicle(s)
17 Raptor, 21 JLUR Rubicon 4xe (ordered 5/24)
They said, or the contract said?

Gupton is in TN, and TN law actually addresses pre-payment restrictions and penalties in state code. They require the following if a pre-payment restriction or penalty exists on any loan....

  • shall state on its face in at least ten (10) point bold type in language separated from the other language in the contract by bold print dividing lines that it cannot be prepaid or that there is a penalty for prepayment.
Both. this was in CO
 

Advertisement



Advertisement
Smart Stop Start
 
Advertisement
Top