Hogdreamer
Well-Known Member
- Thread starter
- #1
My 2021 Sahara Altitude build was completed on the 9th of March, 2021.
It was ordered on 26 February.
On the 12th of March my dealer said it should be at the dealership in a week, two at the most.
Just curious how long other's Wranglers have taken to arrive at their dealership after it's ready to be shipped. Mine has to go to the Twin Cities of Minnesota from the factory.
It was ordered on 26 February.
On the 12th of March my dealer said it should be at the dealership in a week, two at the most.
Just curious how long other's Wranglers have taken to arrive at their dealership after it's ready to be shipped. Mine has to go to the Twin Cities of Minnesota from the factory.
Sponsored