- First Name
- Chad
- Joined
- May 9, 2021
- Threads
- 0
- Messages
- 255
- Reaction score
- 274
- Location
- Pacific NW
- Vehicle(s)
- 2021 JL
- Banned
- #256
So the representative I spoke with tonight told me I am still in the gathering parts phase. FCA is a bumbling, incompetent, joke of an organization. I told the "representative" I spoke with to have a nice trip home inside of his Donald Duck shaped dirigible. He was very confused."All of the materials needed to start the build process have been received. The vehicle should be entering the build process very soon. Currently no Dealer ETA has been provided."
Well, at least I'm not in gathering materials still...
Sponsored