W1ck3d
Well-Known Member
Difference between 19 and 20 is a 3.6l bsg, eco-desiel, a plug in hybrid, and few minor changes to the jeep... 19 is a short model year and the 2020s will be coming in june
Sponsored
If that's the case, then I definitely need to get my order in soon...Difference between 19 and 20 is a 3.6l bsg, eco-desiel, a plug in hybrid, and few minor changes to the jeep... 19 is a short model year and the 2020s will be coming in june
I am curious if all 3.6 will include bsg or if the standard 3.6 will still be offered.Difference between 19 and 20 is a 3.6l bsg, eco-desiel, a plug in hybrid, and few minor changes to the jeep... 19 is a short model year and the 2020s will be coming in june
Production doesn't start until July.2020s will be coming in june
Do you know this ? Or are you guessing. Because BSG is not optional in the ram trucks with 3.6 it’s one way and one way only. BSG is not optional on the turbo four-cylinder it’s one way and one way only. The 2020 Gladiator has no BSG option.They will still have the non bsg 3.6l option but i believe bsg is going to be the way of the future.... They are also adding a couple new trim models in 2020
Difference between 19 and 20 is a 3.6l bsg, eco-desiel, a plug in hybrid, and few minor changes to the jeep... 19 is a short model year and the 2020s will be coming in june
Are we presuming the dates on this? Or is this a certainty? Looking at the calendar it looked like ‘20 ordering starts July 22nd (If I remember right).Production doesn't start until July.
I imagine you meant the order banks will open in June?
According to the leaked calendar production starts 7/22. Orders will open before that. Usually a month or two. However remember nothing is guaranteed and FCA has been known to change dates by as much as a couple months.Are we presuming the dates on this? Or is this a certainty? Looking at the calendar it looked like ‘20 ordering starts July 22nd (If I remember right).
Trying to get exact date as I want to make sure and get my order in before the deadline. Planning on ordering a ‘19 beginning of June.
Ahh.. thanks. Makes senseAccording to the leaked calendar production starts 7/22. Orders will open before that. Usually a month or two. However remember nothing is guaranteed and FCA has been known to change dates by as much as a couple months.
Job 1 for MY20 is slated for July 22nd,with last '19 build out scheduled for July 20th. Job 1 means that's the date they begin building the first unit.If the last built '19 JL will be on the 20th, order banks for the '20s might open before June starts,making it impossible to order a '19 at that point.Are we presuming the dates on this? Or is this a certainty? Looking at the calendar it looked like ‘20 ordering starts July 22nd (If I remember right).
Trying to get exact date as I want to make sure and get my order in before the deadline. Planning on ordering a ‘19 beginning of June.
They don't seem to care much about the added inventory, as dealers still have a ton of '18s in stock. The October release didn't prevent that. Don't forget that the line will be shut down for 3 weeks in May, which will essentially be the end of '19 manufacturing, with only sold orders/high demand orders (or possibly a late release special edition) being built after that.In 2018 Ordering for 2019 started in Sept 13th which was 3 days after I purchased my in stock JL. I would not assume that 2020 would be any different. except by a couple days +/- otherwise they will stick their dealers with a lot of 2019 inventory.
Mopar should care if the dealers have too much old inventory they are not as likely to order new. When I purchased in Sept just 3 days after new orders opened inventory at least in the 5 NW states was really low. I also purchased 14.5% off including lifetime warrantyThey don't seem to care much about the added inventory, as dealers still have a ton of '18s in stock. The October release didn't prevent that. Don't forget that the line will be shut down for 3 weeks in May, which will essentially be the end of '19 manufacturing, with only sold orders/high demand orders (or possibly a late release special edition) being built after that.