Not to be pedantic, but after the experience we all had with FCA getting them, would you even trust a production number straight from the horse’s mouth?Is there any reliable source for the 2020 Diesel Production numbers?
The first batch of customer diesels went down the line in Toledo 3rd week of December 2019 and Jeep delivered precisely one of those dozen or so in 2019. If there are more than 10x 2020 3.0 in Bikini I’d be shocked.If this is accurate they only made 39,667 Wranglers total calendar year 2020 thanks to the shutdown. If you add 34,886 for Nov. & Dec. 2019 (some likely diesels) you still only have 74,553 total built during the Diesel time period. Love to know how many Diesels they built and selfishly how many Bikini Pearl 3.0's.
Wrangler production
The first batch of customer diesels went down the line in Toledo 3rd week of December 2019 and Jeep delivered precisely one of those dozen or so in 2019. If there are more than 10x 2020 3.0 in Bikini I’d be shocked.
I was generous adding the Nov., Dec. numbers. I'd rather over estimate. I think there were more than 10 Bikini 3.0's on Tom's spreadsheet but I'm not sure. For some reason my MacBook doesn't like the file.