Seals881
Member
- First Name
- Matt
- Joined
- Mar 29, 2021
- Threads
- 0
- Messages
- 23
- Reaction score
- 8
- Location
- Seattle, WA
- Vehicle(s)
- Nissan LEAF, JULR Diesel(ordered)
3/24 - Ordered 2021 Jeep 4-door Rubicon 3.0 EcoDiesel
3/26 - Jeep Chat sent "Getting parts needed for production"
3/29 - Jeep Chat sent "VIN# and unit is ready for production"
3/29 - Emailed dealer, and got an updated PoC with VIN#, and status of D1, with estimated ship of April 7th.
04/01 - Dealer told me Jeep was built.
04/02 - Jeep chat " I am showing that your vehicle has been built and is pending installation of additional equipment. This is a necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA has been provided. "
3/26 - Jeep Chat sent "Getting parts needed for production"
3/29 - Jeep Chat sent "VIN# and unit is ready for production"
3/29 - Emailed dealer, and got an updated PoC with VIN#, and status of D1, with estimated ship of April 7th.
04/01 - Dealer told me Jeep was built.
04/02 - Jeep chat " I am showing that your vehicle has been built and is pending installation of additional equipment. This is a necessary step when additional features or optional equipment packages are added to the vehicle. Currently no Dealer ETA has been provided. "
Sponsored