Sponsored

cpost6

Well-Known Member
First Name
Mark
Joined
May 10, 2021
Threads
1
Messages
303
Reaction score
759
Location
Tennessee
Vehicle(s)
Rubicon 392
Without manufacturer incentives:
On the generic Rubicons, dealers make ~3% profit of the MSRP plus the difference of their invoice to MSRP...
~2% of their invoice is holdback...
The manufacturer markup on the generic Rubicon invoice is ~10% to make the MSRP...
Exactly, that’s why there is not much profit to manufacturer on the 392 for 5000-6000 units. While it might seem like a lot to most it is not like a 100,000 units to manufacturer!
Sponsored

 

Membrain

Well-Known Member
First Name
Dirk
Joined
Mar 7, 2020
Threads
5
Messages
1,089
Reaction score
2,824
Location
DFW TX
Vehicle(s)
'20 JTR / '21 XR392
Occupation
Engineer
I know there are 4k+ 392 vins being tracked. is there any way to tell how many have been delivered? I was scrolling through the crypto page and it seems like there are dozens and dozens without a build sheet or a window sticker so if production is ending in 3 months I wonder how many per day would have to be built just to make everything with a vin assigned
Got stats?

Here are some stats from my tracking:
Not counting at least 103 known pre-production models -
So far, at least 4075 known completed units rolled off the assembly line and therefore assumed delivered
at least 62 known units with buildsheets waiting on window stickers
and at least another 112 known units waiting on buildsheets

Got stats!
 
Last edited:

Snellville392

Well-Known Member
First Name
Richard
Joined
Aug 29, 2021
Threads
2
Messages
244
Reaction score
590
Location
Georgia
Vehicle(s)
2019 740e; 2022 XC40 recharge (2); 2021 XC90 recha
Got stats?

Here are some stats from my tracking:
Not counting at least 103 known pre-production models -
So far, at least 4075 known completed units rolled off the assembly line and therefore assumed delivered
at least 62 known units with buildsheets waiting on window stickers
and at least another 112 known units waiting on buildsheets

Got stats!
dang, you are the man! that means they are building on average 500 a month give or take. if so presumably so long as there are not more than 1200 in the queue they could get them all done by the end of november.
 

Sponsored

OP
OP
REBEL JT

REBEL JT

Well-Known Member
First Name
Joe
Joined
Dec 30, 2020
Threads
2
Messages
510
Reaction score
1,018
Location
Maui Hawaii
Vehicle(s)
21 392XR, 21 392, 20 JLUR, 04 Rubicon Crawler
dang, you are the man! that means they are building on average 500 a month give or take. if so presumably so long as there are not more than 1200 in the queue they could get them all done by the end of november.
That is correct, at last word from inside the factory, they were at 100 392's a day, 6 days a week. any ordered and givin vins, should be built before stop date of dec 4th, barring any unforeseen delays
 

BeepBeepIssaJeep

Well-Known Member
First Name
Bee
Joined
Aug 30, 2021
Threads
1
Messages
115
Reaction score
234
Location
NC
Vehicle(s)
2022 Rubicon 392 Xtreme Recon
That is correct, at last word from inside the factory, they were at 100 392's a day, 6 days a week. any ordered and givin vins, should be built before stop date of dec 4th, barring any unforeseen delays
When you say "stop date of dec 4th," is that model year stop date or no more 392s period?
 

Monster1926

Well-Known Member
First Name
Steven
Joined
Jul 30, 2021
Threads
3
Messages
585
Reaction score
1,129
Location
Fort Wayne
Vehicle(s)
2021 Silverado 2500HD midnight
When you say "stop date of dec 4th," is that model year stop date or no more 392s period?
Model year stop date. No one knows if the 392 will be around in 2022. I think there will be but I’m a nobody. On the flip side cafe standards are getting more strict so they might trim the fat.
 

KJiv

Well-Known Member
Joined
Aug 10, 2021
Threads
0
Messages
99
Reaction score
199
Location
Nashville
Vehicle(s)
2021 Jeep Wrangler 392 XR, 1996 Porsche 911
That is correct, at last word from inside the factory, they were at 100 392's a day, 6 days a week. any ordered and givin vins, should be built before stop date of dec 4th, barring any unforeseen delays
Any word from the inside about when they will start 392XR production?
 

BeepBeepIssaJeep

Well-Known Member
First Name
Bee
Joined
Aug 30, 2021
Threads
1
Messages
115
Reaction score
234
Location
NC
Vehicle(s)
2022 Rubicon 392 Xtreme Recon

Sponsored

WOwen

Well-Known Member
First Name
William
Joined
Jul 3, 2021
Threads
11
Messages
336
Reaction score
596
Location
Chicago
Vehicle(s)
2018 WB Hellcat, 2016 Wrangler, 2021 392 Wrangler
1 of the 62 waiting on Build Sheets. Just glad it's built. That patience will last about another week Haha
 
OP
OP
REBEL JT

REBEL JT

Well-Known Member
First Name
Joe
Joined
Dec 30, 2020
Threads
2
Messages
510
Reaction score
1,018
Location
Maui Hawaii
Vehicle(s)
21 392XR, 21 392, 20 JLUR, 04 Rubicon Crawler
 



Top