Update today. Still no window sticker.
My timeline:
Green Sarge, hard top, headliner, tow package, gate reinforcement, all weather rubber mats, dual door, and cargo rail system.
04/06/2021 - placed order
04/10/2021 - received VIN #736077
04/21/2021 - Passed edit and is available for schedule
05/17/2021 - gathering all parts
06/14/2021 - about to enter assembly - scheduling status.
06/15/2021 - all materials received.
06/25/2021 - estimated ship date (7/21/2021)
07/07/2021 - frame stage.
07/07/2021 - F status - paint.
07/08/2021 - I status - final inspection.
07/10/2021 - built and pending installation of additional features or optional equipment.
07/16/2021 - JB status - body vendor.
07/22/2021 - built - shipped to storage.
08/04/2021 - new ship date (8/7/2021)
My timeline:
Green Sarge, hard top, headliner, tow package, gate reinforcement, all weather rubber mats, dual door, and cargo rail system.
04/06/2021 - placed order
04/10/2021 - received VIN #736077
04/21/2021 - Passed edit and is available for schedule
05/17/2021 - gathering all parts
06/14/2021 - about to enter assembly - scheduling status.
06/15/2021 - all materials received.
06/25/2021 - estimated ship date (7/21/2021)
07/07/2021 - frame stage.
07/07/2021 - F status - paint.
07/08/2021 - I status - final inspection.
07/10/2021 - built and pending installation of additional features or optional equipment.
07/16/2021 - JB status - body vendor.
07/22/2021 - built - shipped to storage.
08/04/2021 - new ship date (8/7/2021)