jlusmc
Well-Known Member
I'm window sticker official now!!
#761896. 84 days order to window sticker/shipping
#761896. 84 days order to window sticker/shipping
Sponsored
Was hauling ford f 150's
Window sticker disappeared - didn't show for tonight's check... must have gone into inspection or transport storage?I'm window sticker official now!!
#761896. 84 days order to window sticker/shipping
Welcome to the forum, too!Hi All
Just received my VON today (50203067) for what is almost the last day to order a 2021 392.
let’s see how long this one takes.
I will acknowledge that I’ve read this entire 206 page post and feel like I know all you guys. Thank you all for the great conversation.
Found On Rail Destroyed (FORD) ?Was hauling ford f 150's
I received an email on 7/7 for the build sheet from criptostickers. this email had two links one for a build sheet (found) and one for window sticker (not found) . I clicked on not found and it populated even though it says not found. The link on the forum tracker does not work when I attempt to locate thru the forum.Window sticker disappeared - didn't show for tonight's check... must have gone into inspection or transport storage?
Make sure, because customer care told me my 767737 was loaded on a hauler and left plant last Friday July 30 at 1:50am and came to find out from dealer that it is not showing an outgate date and time. Just still has ETA to dealer 7/30-8/12. Still in KZS and should ship any day now. Who knows!Dealer confirmed the 392 has shipped. No ETA yet. Sticker still has not shown. 10 days in storage. Ordered 4/20. VIN 761618.
My original dealers est ship date was the day the build actually started, the build sheet populated when the jeep was listed as in paint stage and the window sticker didn't populate until the Jeep went into KZS / shipping status There are several stages in between such as inspection and storage where you can get hung up for a while.My vin is 732998. My dealer says I don’t have a estimated shipping date yet but I have a buildsheet. Jeep chat says I’ve entered production. I’m assuming that a buildsheet is created right as it starts to be assembled??
That gives me a better idea of what to expect. It just seams so random of when 392s are built and shippedMy original dealers est ship date was the day the build actually started, the build sheet populated when the jeep was listed as in paint stage and the window sticker didn't populate until the Jeep went into KZS / shipping status There are several stages in between such as inspection and storage where you can get hung up for a while.
Timeline for mine:
Order to Build start 56 days (also received build sheet on day 56)
Build took 3 days
placed in storage for 26 days
entered shipping "KZS" on Day 84 (also received window sticker on day 84)
Today is day 85 and still waiting on a train ride to TX