alksion

Well-Known Member
First Name
Josiah
Joined
Jan 3, 2021
Messages
756
Reaction score
582
Location
OC, CA
Vehicle(s)
2021 Sahara Altitude, 2021 Rubicon 392 (Waiting)
Occupation
Business Owner
Sorry to double post but a quick question. Can the car be in D1 with a tentative build date or does it have to have a confirmed build date?





Advertisement

 

CpT Papa

Well-Known Member
First Name
Matt
Joined
Mar 26, 2021
Messages
146
Reaction score
277
Location
SoCal
Vehicle(s)
RUBICON 392
Sorry to double post but a quick question. Can the car be in D1 with a tentative build date or does it have to have a confirmed build date?
According to the build code descriptions posted here.
Scheduled:
C=Tentative schedule.
D=Firm schedule, serial # assigned. (VIN)
D1=Gateline: Unit sequenced for production, est ship date assigned.
The most common cut and paste answer for D1 from chat is "All of the materials needed to start the build process have been received. The vehicle should be entering the build process very soon."
Chat will not now the est ship date date on the POC. The best way to find out what stage you are in is have the dealer print out the POC. If in D1 it should have an estimated ship date. I have not seen any reference to a build date but some believe the ship date is the start of build. Good luck.
PS.. What car did you order? I thought you were getting a Jeep.:)
 
Last edited:

cpost6

Well-Known Member
First Name
Mark
Joined
May 10, 2021
Messages
71
Reaction score
142
Location
Southeast
Vehicle(s)
Rubicon 392
Anyone know if Gorilla Glass is still holding up orders from going D to D1? My second order 767737 is still sitting in D. Only difference my order 761710 that is in D1 with estimated ship date 6/24 has sky one touch and no Gorilla Glass and second order has no one touch and Gorilla Glass. Rest of options same on both orders.
 

alksion

Well-Known Member
First Name
Josiah
Joined
Jan 3, 2021
Messages
756
Reaction score
582
Location
OC, CA
Vehicle(s)
2021 Sahara Altitude, 2021 Rubicon 392 (Waiting)
Occupation
Business Owner
According to the build code descriptions posted here.
Scheduled:
C=Tentative schedule.
D=Firm schedule, serial # assigned. (VIN)
D1=Gateline: Unit sequenced for production, est ship date assigned.
The most common cut and paste answer for D1 from chat is "All of the materials needed to start the build process have been received. The vehicle should be entering the build process very soon."
Chat will not now the est ship date date on the POC. The best way to find out what stage you are in is have the dealer print out the POC. If in D1 it should have an estimated ship date. I have not seen any reference to a build date but some believe the ship date is the start of build. Good luck.
PS.. What car did you order? I thought you were getting a Jeep.:)
Haha smart ass ;) I ordered a Jeep Liberty 2006. It’s so sick!!! FWD and a disgusting use of cheap plastics. The perfect car for me.

Thank you though for the description. This certainly helps. I’m excited to see what Jeep Chat will say on Friday and I will update it here.
 

alksion

Well-Known Member
First Name
Josiah
Joined
Jan 3, 2021
Messages
756
Reaction score
582
Location
OC, CA
Vehicle(s)
2021 Sahara Altitude, 2021 Rubicon 392 (Waiting)
Occupation
Business Owner
Anyone know if Gorilla Glass is still holding up orders from going D to D1? My second order 767737 is still sitting in D. Only difference my order 761710 that is in D1 with estimated ship date 6/24 has sky one touch and no Gorilla Glass and second order has no one touch and Gorilla Glass. Rest of options same on both orders.
Well I’m hoping but this is good news since I don’t have a gorilla glass and I do have sky one touch! Let’s go!!
 

Slickrockguy

Member
First Name
Ken
Joined
Sep 28, 2018
Messages
14
Reaction score
13
Location
Salt Lake City
Vehicle(s)
2019 JLUR
Anyone know if Gorilla Glass is still holding up orders from going D to D1? My second order 767737 is still sitting in D. Only difference my order 761710 that is in D1 with estimated ship date 6/24 has sky one touch and no Gorilla Glass and second order has no one touch and Gorilla Glass. Rest of options same on both orders.
Are these both 392's? If so, I'm happy because that VIN is only a couple hundred away from mine.
 

supermike

Well-Known Member
First Name
mike
Joined
Sep 14, 2018
Messages
332
Reaction score
479
Location
Irvine CA
Vehicle(s)
18 JLUR 6 speed
According to the build code descriptions posted here.
Scheduled:
C=Tentative schedule.
D=Firm schedule, serial # assigned. (VIN)
D1=Gateline: Unit sequenced for production, est ship date assigned.
The most common cut and paste answer for D1 from chat is "All of the materials needed to start the build process have been received. The vehicle should be entering the build process very soon."
Chat will not now the est ship date date on the POC. The best way to find out what stage you are in is have the dealer print out the POC. If in D1 it should have an estimated ship date. I have not seen any reference to a build date but some believe the ship date is the start of build. Good luck.
PS.. What car did you order? I thought you were getting a Jeep.:)

I don't even get a date in D1.....sad.confused..
 

Kapoosh1

Well-Known Member
Joined
Oct 21, 2018
Messages
74
Reaction score
76
Location
NorCal
Vehicle(s)
JLU, 991TT, GLC43, Q8
My Snazzberry is in D1 status

last 6: 761493
Ordered: 4/12/21
 
Last edited:

Young04

Well-Known Member
Joined
Mar 12, 2018
Messages
577
Reaction score
504
Location
MA
Vehicle(s)
2018 Ocean Blue JLUR, Hydro Blue 392 ordered
Anyone know if Gorilla Glass is still holding up orders from going D to D1? My second order 767737 is still sitting in D. Only difference my order 761710 that is in D1 with estimated ship date 6/24 has sky one touch and no Gorilla Glass and second order has no one touch and Gorilla Glass. Rest of options same on both orders.
There is a thread on this. The latest is that someone was told by their dealer that GG is on backorder.
 

asuperheat

Well-Known Member
First Name
Chris
Joined
Apr 20, 2021
Messages
83
Reaction score
64
Location
Florida
Vehicle(s)
08 JKU, 21 JLUR 392 on order
No rhyme or reason to the schedule Mine has been built for a while sitting in I status awaiting inspection. they built it over the memorial day weekend and it has been sitting every since. Probably forgot where they parked it LOL!

They can build hundreds a day but takes weeks for inspection seems odd but I guess there is no odd when it comes to a Rubi 392. Must be one big parking lot.
 

Advertisement




Quadratec
 



Advertisement
Top