Anyone figure out what KZP is that is requiring it to go to the body shop on a fully loaded Rubi that is delaying the shipping by approx a month? Was supposed to ship 4/5 (built in Feb) now at 4/29 😳
I was one of those original Rubicon turbo orders in 2018. Oh man that wasn’t fun. I ordered the first day you could place an order and got it in August.
Ordered 4xe Rubicon nearly fully loaded (same as the turbo) on 1/9 and finally have the build sheet today. We’ll be hanging out in storage...
I ordered on 1/9 and specifically said I had the Tread Lightly code and they didn’t say anything to the contrary so I hope this isn’t a new restriction. I just read the terms last night (pic below).
Does anyone know if the existing JL Mopar snorkel for the 2.0 Turbo engine will work with the 4xe.
I know lots of comments will be coming on electricity and snorkels nevertheless I’ll want to attach my existing 2.0 Mopar snorkel if possible.
Let us know if you get the dreaded Crankshaft Hose disconnect MIL (engine light). See my threads in this posting area. I never was able to get those errors to stop even after having Jeep take the Jeep for 3+ weeks (and it was dealer installed to make sure it was under warranty). As you will...