Sponsored

JL Window Sticker and Build Sheet Order Tracking

Yakpimp

Moderator
Moderator
First Name
K
Joined
Dec 23, 2017
Threads
18
Messages
499
Reaction score
648
Location
PNW
Vehicle(s)
2018 JLUR
I am good with the new clean look. I am also glad to hear a VIN gets updated once an hour, thats all i really needed. Now that I know this, I can stop killing my F5 button.
I added an updated time to the table caption so you can still see the time again.
 

RLsJL

Member
First Name
Rich
Joined
May 5, 2018
Threads
2
Messages
17
Reaction score
3
Location
San Diego
Vehicle(s)
2018 Jeep Wrangler Rubicon JLU
I typed in all info and got this back "
Server Error in '/' Application.
Runtime Error"
 

lorlik

Well-Known Member
First Name
Leonid
Joined
Jul 6, 2018
Threads
0
Messages
51
Reaction score
22
Location
MA
Vehicle(s)
2014 Jeep Grand Cherokee Overland (Sold), 2018 Jeep Wrangler JLUR White
I added an updated time to the table caption so you can still see the time again.
Thank you for doing this for all of us.
In what timezone is the time?
Also, there used to be a statistic on how long the builds are taking on average per trim/door/engine configuration. Is it possible to bring that back?
 

Sponsored

Yakpimp

Moderator
Moderator
First Name
K
Joined
Dec 23, 2017
Threads
18
Messages
499
Reaction score
648
Location
PNW
Vehicle(s)
2018 JLUR
Thank you for doing this for all of us.
In what timezone is the time?
Also, there used to be a statistic on how long the builds are taking on average per trim/door/engine configuration. Is it possible to bring that back?
The time zone is PST, I’ll add that.

I’m adding the average wait time graph to the stats page now. It should show up within the hour.
 

lorlik

Well-Known Member
First Name
Leonid
Joined
Jul 6, 2018
Threads
0
Messages
51
Reaction score
22
Location
MA
Vehicle(s)
2014 Jeep Grand Cherokee Overland (Sold), 2018 Jeep Wrangler JLUR White
Average times are now available.

ZmFtA60.png
Awesome! Thanks. Does the calculation include pending orders with their duration so far or only the ones that have completed?
Also, would it be possible to add min and max?
 

Yakpimp

Moderator
Moderator
First Name
K
Joined
Dec 23, 2017
Threads
18
Messages
499
Reaction score
648
Location
PNW
Vehicle(s)
2018 JLUR
Awesome! Thanks. Does the calculation include pending orders with their duration so far or only the ones that have completed?
Also, would it be possible to add min and max?
It's only completed. Yeah I think I can add min and max.
 

Sponsored

SONofHELGI

Well-Known Member
First Name
Michael
Joined
Jul 22, 2018
Threads
11
Messages
102
Reaction score
197
Location
Enterprise, Alabama
Vehicle(s)
2018 Jeep Wrangler JL Rubicon
Occupation
Something that sounds technical, but it's not.
This is Amazing guys, thank you so much. I would like to ask the dumb question (Remember, there are no dumb questions, just dumb people). Can we get clarification on where in the process "BUILD", "STICKER" and "UPDATED" (Complete) are in the order? Also, does complete mean it's at the dealership, or just complete at the factory and waiting delivery? Thanks for the clarification, it's much appreciated.
 

2015er

Well-Known Member
First Name
Jim
Joined
Apr 13, 2018
Threads
1
Messages
284
Reaction score
403
Location
Glenville, NY
Vehicle(s)
2018 Wrangler 2-dr Rubicon & 2015 Ram 1500 Laramie 4x4
This is Amazing guys, thank you so much. I would like to ask the dumb question (Remember, there are no dumb questions, just dumb people). Can we get clarification on where in the process "BUILD", "STICKER" and "UPDATED" (Complete) are in the order? Also, does complete mean it's at the dealership, or just complete at the factory and waiting delivery? Thanks for the clarification, it's much appreciated.
The build process is structured on a letter notation system as follows:

Status codes and other information


Scheduling: (only D1 is reported by MOTS)
C – Tentative schedule
D – Firm schedule, serial number is assigned
D1 – Gateline: plant has sequenced the vehicle for production, estimated ship date usually (but not always) assigned


Build stages: (may or may not be reported by MOTS)
E – framing
F – paint
G – trim

Built/shipping:
I – vehicle is built; quality control and final inspection pending
J – vehicle has passed final inspection, but has not been released to carrier
JB – shipped to body vendor (typically for decals or stripes)
JS – shipped to storage (to await shipping; also for extended quality control, vehicle flash updates etc.)
KZ – released by plant and invoiced
KZLD - in transit, delayed (typically not reported by MOTS)

This appears to be much more organized then actually is - particularly for those opting for the 2.0L turbo motor as I have. The orders withe 3.6L PentaStar are moving through on a reliable and predictable basis. Orders with the 2.0L turbo motor are all over the place - some are backed up to February.
 

lorlik

Well-Known Member
First Name
Leonid
Joined
Jul 6, 2018
Threads
0
Messages
51
Reaction score
22
Location
MA
Vehicle(s)
2014 Jeep Grand Cherokee Overland (Sold), 2018 Jeep Wrangler JLUR White
The build process is structured on a letter notation system as follows:

Status codes and other information


Scheduling: (only D1 is reported by MOTS)
C – Tentative schedule
D – Firm schedule, serial number is assigned
D1 – Gateline: plant has sequenced the vehicle for production, estimated ship date usually (but not always) assigned


Build stages: (may or may not be reported by MOTS)
E – framing
F – paint
G – trim

Built/shipping:
I – vehicle is built; quality control and final inspection pending
J – vehicle has passed final inspection, but has not been released to carrier
JB – shipped to body vendor (typically for decals or stripes)
JS – shipped to storage (to await shipping; also for extended quality control, vehicle flash updates etc.)
KZ – released by plant and invoiced
KZLD - in transit, delayed (typically not reported by MOTS)

This appears to be much more organized then actually is - particularly for those opting for the 2.0L turbo motor as I have. The orders withe 3.6L PentaStar are moving through on a reliable and predictable basis. Orders with the 2.0L turbo motor are all over the place - some are backed up to February.
Nope, V6s are not moving on predictable basis. You can visit the JB freeze thread to see how there's no predictable timelines for anything.
 

tp_ict

New Member
First Name
Tom
Joined
Jul 24, 2018
Threads
0
Messages
4
Reaction score
1
Location
KS
Vehicle(s)
2013 Grand Cherokee
Nope, V6s are not moving on predictable basis. You can visit the JB freeze thread to see how there's no predictable timelines for anything.
Sport, 3.6L, soft top, manual transmission, billet silver, anti-spin differential, all-terrain tires, tinted windows, trailer tow, A/C, rock rails. Ordered 6/4, entered JB status 6/26. Nobody can give me any information on the reason for the delay or when a shipping date might be assigned.
 

Advertisement



Advertisement

 


Top