Sponsored

D1 Order Status

SimpleAce

Well-Known Member
First Name
Tyler
Joined
Sep 20, 2019
Threads
14
Messages
74
Reaction score
37
Location
Denver, CO
Vehicle(s)
2020 JLUR
Hello everyone!

On average when people order their jeep how long have you guys been in D1 status or any order code.

Just looking to see the average time frame for build. Mines pretty basic. No accessories just a JLUR with packages.
Sponsored

 

JeepTon

Member
Joined
Dec 12, 2019
Threads
0
Messages
19
Reaction score
10
Location
Los Angeles, California
Website
advexure.com
Vehicle(s)
2020 JLU Sahara
Curious as well...I've been in D1 since 12/18. So 19 days to date...

Jeep Chat says they may remain in D1 for a minimum of 30 days before they move to production.
 

Ruri

Well-Known Member
First Name
Richard
Joined
Nov 3, 2019
Threads
5
Messages
51
Reaction score
62
Location
SoCal
Vehicle(s)
JLURD, Gen 2 Raptor, 997.1 Turbo, F90 Competition
Occupation
Not FDIC
I’ve been in D1 since 11/11/19
 
OP
OP
SimpleAce

SimpleAce

Well-Known Member
First Name
Tyler
Joined
Sep 20, 2019
Threads
14
Messages
74
Reaction score
37
Location
Denver, CO
Vehicle(s)
2020 JLUR
Curious as well...I've been in D1 since 12/18. So 19 days to date...

Jeep Chat says they may remain in D1 for a minimum of 30 days before they move to production.
Whats your build look like?
 

Sponsored

Compression-Ignition

Well-Known Member
First Name
Roy
Joined
Nov 12, 2019
Threads
17
Messages
884
Reaction score
988
Location
Montana
Vehicle(s)
2020 JLUR 3.0 Diesel, 2020 6.7L F350
Curious as well...I've been in D1 since 12/18. So 19 days to date...

Jeep Chat says they may remain in D1 for a minimum of 30 days before they move to production.
Can't take them seriously.....
 

Tiger1

Well-Known Member
First Name
Tiger
Joined
Sep 24, 2019
Threads
2
Messages
121
Reaction score
211
Location
South Carolina
Vehicle(s)
2020 JLUS, 2016 BMW 435
Hello everyone!

On average when people order their jeep how long have you guys been in D1 status or any order code.

Just looking to see the average time frame for build. Mines pretty basic. No accessories just a JLUR with packages.
Here's the thread from my order process - which got stuck in I status. There's a detailed summary on the third page posted by FLOT which might help set expectations for your build time:

https://www.jlwranglerforums.com/forum/threads/help-waiting-on-2020-jl-order.38502/
 

JeepTon

Member
Joined
Dec 12, 2019
Threads
0
Messages
19
Reaction score
10
Location
Los Angeles, California
Website
advexure.com
Vehicle(s)
2020 JLU Sahara
Whats your build like?
JLU Sahara
  • 2.0L Auto
  • Granite Crystal Metallic
  • Leather Seats
  • 8.4" Radio / Premium Audo
  • Safety & Advanced Safety Group
  • Cold Weather Group
  • LED Group
  • Remote Proximity Keyless Entry
  • Sky One-Touch Power Top
  • Mopar Floor Mats, Chrome Tube Steps, Stainless Door Sill Guards

Ordered from Peterson in Nampa, ID and will be flying up there from LA to bring it on its first road trip whenever it gets in :)
 

Truckin

Member
First Name
Matt
Joined
Jun 1, 2019
Threads
0
Messages
8
Reaction score
7
Location
Texas
Vehicle(s)
2019 JLUR (Totaled), 2020 JLUR
I have been in D1 since 12/17/19, my order could start production tomorrow or a month from now - I quit checking with Jeep Chat as it is a waste of time. My dealer cannot get any info either - just a delivery target that does not seem to mean much - a couple of weeks ago my delivery target was 01/14. My only theory at this point, is they are trying to run a bunch of Diesels through to fill the pipeline and close out some long standing orders.
 

Melny67

Well-Known Member
First Name
Melvin
Joined
Oct 8, 2019
Threads
14
Messages
304
Reaction score
184
Location
Staten island
Vehicle(s)
Jeep jlu
JLUS Ordered 1/13/20
1/16/20 D1
Dealership says production will start at 2/1/20 how accurate would that be? He didn't give me a ship date so I was a little bit confused because everyone got a estimate when they got D1. Unsure if he meant to say it ships on 2/1/20.
 

Sponsored

Truckin

Member
First Name
Matt
Joined
Jun 1, 2019
Threads
0
Messages
8
Reaction score
7
Location
Texas
Vehicle(s)
2019 JLUR (Totaled), 2020 JLUR
I just received my build sheet today (about 35 days in D1 including the holidays).
 

Tiger1

Well-Known Member
First Name
Tiger
Joined
Sep 24, 2019
Threads
2
Messages
121
Reaction score
211
Location
South Carolina
Vehicle(s)
2020 JLUS, 2016 BMW 435
Build sheet arrived Monday (01/20/20) evening! Order placed 12/24/19, VIN/VON 12/24/19, D1 1/11/20.
Finally, congratulations! I know it's frustrating, I felt the same way - keep your head up your new jeep will be here before you know it. Hopefully the rest of your build process will move quickly.
 

John Galt

Well-Known Member
First Name
Chris
Joined
Aug 8, 2019
Threads
8
Messages
109
Reaction score
79
Location
Fairfax
Vehicle(s)
2020 JLUR
Finally, congratulations! I know it's frustrating, I felt the same way - keep your head up your new jeep will be here before you know it. Hopefully the rest of your build process will move quickly.
Thanks, time frame still seems to be in line with what I was expecting, but of course I just want it right now ;):LOL:
 

PaulwithJeep

Well-Known Member
First Name
Paul
Joined
Dec 3, 2019
Threads
9
Messages
171
Reaction score
313
Location
Dwayne Lane's in Everett, WA
Vehicle(s)
2019 RAM 1500, 2021 Jeep Grand Cherokee
Hello everyone!

On average when people order their jeep how long have you guys been in D1 status or any order code.

Just looking to see the average time frame for build. Mines pretty basic. No accessories just a JLUR with packages.
Behind the scenes answer to you and everyone's build status. The holidays where the first slow down. I have 10 factory orders placed before the holidays and they were all stuck in D or D1. After the holidays their was an internal reason for Chrysler not building anything for a short period in time that delayed things further. On average the orders I place take about 6 weeks. Right now I'm going to be averaging closer to 10-12 weeks. Now that things are back to normal though I would tell a new ordering customer 6-8 weeks.
Sponsored

 
 



Top