Sponsored

Power Soft Top Available to Order 6/7! [UPDATE: OPEN NOW and First Confirmed Order!]

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director

Ike582

Well-Known Member
First Name
Ike
Joined
Mar 31, 2018
Threads
0
Messages
135
Reaction score
105
Location
Chicago, IL USA
Vehicle(s)
2018 JL Rubicon Granite Crystal
I ordered my JLU Rubicon Granite Crystal on June 12th. I connected today with Jeep Chat and they said my car remains in D status, and "the order is in the scheduling phase of the manufacturing process. The parts required to build the vehicle are being scheduled and as soon as they are available and ready, the order will be scheduled for build. If it remains in this stage beyond 45 days we can further escalate."

So I guess I'm nowhere, right? ;)
 

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director
I just moved from D1 back to D.
Bummer
 

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director
I just moved from D1 back to D.
Bummer
I am in D1 according to a live person at Jeep Customer Care. My status did flip to D1 yesterday she said.
So apparently I was D1 on Monday. Bumped back to D on Tuesday. Late Wednesday I moved into D1 a second time. I think I am happy :idea::clap:
 

jvanloon

Well-Known Member
First Name
Jeromy
Joined
Jul 10, 2018
Threads
2
Messages
116
Reaction score
99
Location
Los Angeles
Vehicle(s)
2018 JLUR, 2022 JLURXR on Order
I am in D1 according to a live person at Jeep Customer Care. My status did flip to D1 yesterday she said.
So apparently I was D1 on Monday. Bumped back to D on Tuesday. Late Wednesday I moved into D1 a second time. I think I am happy :idea::clap:
I also appear to have moved from D1 back to D and now up to D1 again between monday and today. I still don't have a target production week. I guess we'll see where this goes.
 

Sponsored

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director
I also appear to have moved from D1 back to D and now up to D1 again between monday and today. I still don't have a target production week. I guess we'll see where this goes.
Sahara or Rubicon and which options?
 

jvanloon

Well-Known Member
First Name
Jeromy
Joined
Jul 10, 2018
Threads
2
Messages
116
Reaction score
99
Location
Los Angeles
Vehicle(s)
2018 JLUR, 2022 JLURXR on Order
Sahara or Rubicon and which options?
Rubicon Unlimited, Mojito, Auto, Leather, Body Color Flares, Proximity Entry, Steel bumper, Safety group, Electronic infotainment, Power top, Trailer Tow, Cold weather and LED.
 
OP
OP

Templeton

Well-Known Member
Joined
Jan 9, 2018
Threads
1
Messages
240
Reaction score
133
Location
New York, New York
Vehicle(s)
RR Sport; Lexus GX
I think I need to limit myself to one check-in per week with Jeep. This isn’t healthy. I just want it by mid to end of August.
 

Sponsored

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director
Here is a list of frequent plant production codes.

Scheduled:
  • D – firm schedule: serial number assigned, approx time in station – 5 days
  • D1 – gateline: unit sequenced for production, est ship date assigned, Approx time in station – 12 days
Build:
  • E – framing
  • F – paint
  • G – trim

Built:
  • I – unit built, pending final inspection
  • J – vehicle passed final inspection but not released to carrier
  • JB – shipped to body vendor
  • JE – shipped to emissions
  • JJ – consigned to body vendor
  • JS – shipped to storage
  • KZ – released by plant and invoiced

Traffic Codes:
  • KZ L – released but not shipped KZ M – first rail departure
  • KZ N – first rail arrival
  • KZ O – delayed/received
  • KZOA – plant hold, quality audit
  • KZOB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle divertedK
  • Z OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
  • KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
  • KZ OE – misdropped or misshipped vehicle
  • KZ OH – all other “O” type carrier codes
  • KZ T – second rail departure
  • KZ U – second rail arrival
  • KZ X – delivered to dealer
 

Gregodav

Well-Known Member
First Name
Dave
Joined
Dec 3, 2017
Threads
31
Messages
940
Reaction score
989
Location
Wichita, KS
Vehicle(s)
Rubicon 2014, Solstice 2007, 1993 GMC Pick-up
Occupation
I. T. Director and Video Director
I’m back in D. Can you call and check to please?
I called dealer. I am in D1 with a ship date of next Saturday, July 21. Kim @ Superior said that usually is when they start assembly.
Sponsored

 
 



Top