Jeepznthingz
Well-Known Member
- Joined
- Jan 3, 2019
- Threads
- 2
- Messages
- 466
- Reaction score
- 765
- Location
- Under a rock
- Vehicle(s)
- 2021 JLURXR Tuscadero, 2023 JLURXR Reign
If an order is confirmed and VON assigned, is that solid?What?
C is basically order confirmed
D is VIN assigned
D1 is scheduled
And the official terms are
C = tentative schedule
D = firm schedule: serial number assigned
D1 = gateline: unit sequenced for production, est ship date assigned
Sponsored