JimmyZ
Well-Known Member
Congratulations #JealousSo for the record of tracking, here is the complete timeline:
And there is the gestation period from start to finish.
- 15 Dec 2020 ordered
- 16 Dec VON
- 17 Dec VIN and POC
- Stays in D phase since hydro blue JL was not starting the line until early February, found this out in 6 Jan
- 6 Jan 2021 D1, estimated ship 17 Feb
- 16 Feb Paint Stage F
- 18 Feb started first stage of assembly line (have pic proof). Finished the line and to inspection. Failed inspection, excess weld slag on sport bar. Returned.
- 22 Feb to upfitter (down the street) for HD rails w/step assist, gate reinforcement, etc
- 25 Feb in shipping. Per sales manager once physically leaving from Toledo, no more than 48 hours to delivery at lot in Gaithersburg. ≈450 miles and truck shipped
- 27 Feb released to transport
- 2 Mar at 10:33a, vehicle on truck on dealer lot
- 6 Mar will be driving the new Rubi